SBIR/STTR Research Award

Plasma Switch for 11.4 GHz Active Sled-II RF Pulse Compressor

Award identifier d87a6887149e9366c3def75c61d93f50510bb1b4476154115d2046f08beb899dAwarding agency Department of Energy

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2002

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Omega-P, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

70518 The high pulsed radio frequency (rf) power, needed for a future electron-positron collider such as NLC, will require rf pulse compression, for which a number of approaches are currently under study. Active rf pulse compression can - in principal - provide greater flexibility in compressor design than passive compression, because higher compression ratios can be achieved at higher efficiency. This project will develop a plasma switch for an active SLED-II rf pulse compressor with a compression ratio greater than 8:1 and an efficiency greater than 80%. The plasma switches will be used with resonance structures having a reflection coefficient that can be rapidly shifted during the rf pulse from a klystron. Changing both the reflection coefficient of the switch and the phase of the klystron output will allow high compression ratios with high efficiency. In Phase I, designs will be optimized (at both high and low nitrogen gas pressure in the discharge tubes, and for a variety of X-band resonance structures) in order to couple the rf power from a klystron into a pair of relatively short delay lines and then, upon switching, into an accelerator structure. Low-power cold tests will be conducted on the most promising designs, in order to select the best design for fabrication and high-power testing in Phase II. Commercial Applications and Other Benefits as described by awardee: The rf plasma switches, with reflectivity that can be changed rapidly to produce rf pulse compression greater than 8:1 with efficiency >80%, could be adopted for use in a future electron-positron collider. Thousands of these switches would be required, constituting a potential commercial market of several tens of millions of dollars.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.