SBIR/STTR Research Award

DEVELOPMENT OF A 300 MEGAWATT S-BAND RELATIVISTIC KLYSTRON AMPLIFIER

Award identifier ecf9c12526387db636cc384865176d12fa51871053afaa740eedb98ea11fe550Awarding agency Department of Energy

Award amount

$50,000

Program and phase

SBIR · Phase I

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Mds Company
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

IN PHASE I, ANALYSIS AND COMPUTER SIMULATION IS USED TO DESIGN A 300 MW RELATIVISTIC KLYSTRON OPERATING AT 3.0 GHZ WITH A PULSE REPETITION RATE OF 1 KHZ AND A PULSE WIDTH OF 3.0 MICROSECONDS, GIVING 900 JOULES OF ENERGY PER PULSE. THE ANALYSIS AND DESIGN ARE BASED ON CONVENTIONAL KLYSTRON THEORY. AN ELECTRON GUN IS BEING DESIGNED TO OPERATE AT 695 KILOVOLTS ACCELERATING VOLTAGE, PRODUCING AN 870-AMPERE SOLID ELECTRON BEAM FROM A THERMIONIC CATHODE OPERATING IN ULTRAHIGH VACUUM. BY USING PROPRIETARY RELATIVISTIC COMPUTER CODES, AN ELECTROMAGNETIC WAVE-ELECTRON BEAM INTERACTION CIRCUIT IS BEING DESIGNED, CAPABLE OF PRODUCING 300 MW WITH A MINIMUM SATURATED GAIN OF 58 DB AND A MINIMUM EFFICIENCY OF 59.5%. A MULTIPLE CAVITY EXTENDED INTERACTION RADIO FREQUENCY (RF) OUTPUT CIRCUIT THAT WILL EFFICIENTLY EXTRACT THE RF POWER FROM THE ELECTRON BEAM IS BEING DESIGNED AND ANALYZED FOR POSSIBLE ELECTRIC FIELD BREAKDOWN. THE RF OUTPUT WAVEGUIDE SYSTEM CONSISTS OF TWO DIAMETRICALLY OPPOSED WAVEGUIDES, EACH WITH TWO CERAMIC VACUUM WINDOWS. HIGH THERMAL CAPABILITY, LONG LIFE, AND RUGGEDNESS WILL BE EMPHASIZED THROUGHOUT PHASE I. PHASE II WILL CONSIST OF COMPLETE MECHANICAL DESIGN, FABRICATION, AND RF TESTING OF THE VARIOUS COMPONENTS; THIS 300 MW S-BAND RELATIVISTIC KLYSTRON WILL ALSO BE ASSEMBLED AND PREPARED FOR TEST.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.