SBIR/STTR Research Award

Development of Acoustic Bandgap Materials and Devices

Award identifier e5efcc97c43e1aef892a9c9f38a34e920e926c539be9d9864e374ca3432807d0Awarding agency Department of Defense · Defense Advanced Research Projects Agency

Award amount

$99,000

Program and phase

SBIR · Phase I

Award year

1999

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Defense Advanced Research Projects Agency
Recipient company
AEROTECH ENGINEERING & RESEARCH CORP.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

Not Available Active Magnetic Bearings (AMBs) with their ability to electronically manipulate rotor system dynamics, add damping as required and operate without lubricants offer an attractive alternative to conventional liquid lubricated bearing systems, especially in flywheel energy storage (FESS) devices, such as are planned for future land based combat vehicles. However, offsetting the many advantages of the AMB are its sensitivity to transient loads and the lack of a built in fail safe mechanism to capture the rotor and protect the FESS in the event of a system failure. To meet this need MiTi has conceived and has tested two shock tolerant auxiliary bearings, the Zero Clearance Auxiliary Bearing (ZCAB) and the Powder Lubricated Auxiliary Bearing (P-LAB). Each is suitable for high speed vacuum operation. Under Phase I, MiTi will identify the design requirements for a vehicular class (e.g., the combat hybrid propulsion system) RESS shock tolerant auxiliary bearing designs to meet the design requirements, identify the required tribomaterial system (i.e, shaft material, bearing material and dry lubricant), select the bearing most suitable for Phase II demonstration and establish the development test rig concepts designs needed for Phase II. Under Phase II, MiTi will complete the detailed design and fabricate the selected auxiliary bearing for development testing.

Technology keywords

Not reported

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.