Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Nuclear Regulatory Commission
- Branch
- Not reported
- Recipient company
- FOSTER-MILLER, INC.
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- XDF1FRDG8KK4
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYSTEM. THIS WAS THE FIRST ACTUATION OF AN EMERGENCY CORE COOLING SYSTEM COMPONENT EXPERIENCED BY THE JAPANESE NUCLEAR POWER INDUSTRY. A STEAM GENERATOR TUBE RUPTURE HAS SPECIAL SIGNIFICANCE TO PLANT SAFTEY BECAUSE IT REPRESENTS THE SIMULTANEOUS LOSS OF TWO OF THE THREE BARRIERS TO THE RELEASE OF FISSION PRODUCTS TO THE ATMOSPHERE. WHEN A STEAM GENERATOR TUBE FAILS, BOTH THE REACTOR COOLANT SYSTEM AND THE CONTAINMENT BUILDING ARE BREACHED. THIS EVENT IS VERY SIMILAR TO A TUBE RUPTURE WHICH OCCURRED AT NORTH ANNA UNIT 1 ON JULY 15, 1987. LIKE THE MIHAMA 2 EVENT, THE PRIMARY-TO-SECONDARY LEAKAGE WAS THE RESULT OF THE COMPLETE SEVERANCE OF A SINGLE TUBE IMMEDIATELY ABOVE THE UPPERMOST (7TH) TUBE SUPPORT PLATE ON THE COLD LEG SIDE. ANALYSIS INDICATED THAT THE TUBE FAILED AS A RESULT OF HIGH CYCLE FATIGUE, WITH THE FATIGUE CRACKS ORIGINATING ON THE OD SURFACE. IT WAS CONCLUDEDTHAT THE TUBE HAD EXPERIENCED FLUID ELASTIC INSTABILITY WHICH HAD CAUSED LARGE U-BEND DEFLECTIONS AND AN ALTERNATING STRESS LEVEL SUFFICIENT TO INITIATE FATIGUE CRACKING. DESPITE THE IMPORTANCE OF NATURAL FREQUENCY AND DAMPING IN DETERMINING THE MARGIN TO FLUID ELASTIC EXCITATION, NOT MUCH IS KNOWN ABOUT ACTUAL TUBE FIXITY CONDITIONS IN AN OPERATING STEAM GENERATOR. IT IS SUSPECTED THAT DEPOSITS WHICH ACCUMULATE IN THE TUBE SUPPORT PLATE HAVE AN EFFECT ON TUBE FIXITY AND THEREFORE ON THE FLUID ELASTIC STABILITY MARGIN. HOWEVER, THE EXTREMELY LIMITED SUCCESS AND THE RADIATION FIELDS WHICH ARE PRESENT PRECLUDE THE USE OF EXISTING VIBRATION MEASUREMENT SYSTEMS. A SYSTEM CAPABLE OF PERFORMING DIRECT MEASUREMENTS OF STEAM GENERATOR TUBE U-BENT VIBRATORY RESPONSE WOULD HAVE TO BE REMOTELY DEPLOYABLE AND
Technology keywords
Not reported
Research funding history
924 SBIR/STTR records share this UEI (1983–2006). Reported award amounts total $172,256,128. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Health and Human Services, Department of Energy, Department of Transportation, Environmental Protection Agency
Agency intelligence
Nuclear Regulatory Commission
Back to SBIR/STTR Research Awards