SBIR/STTR Research Award

Femtosecond Timing Distribution and Control for Next Generation Accelerators and Light Sources

Award identifier 3aec98bdd3a709eca97987d0a3baf09acec0ed2befa2d8041944bf77789e6191Awarding agency Department of Energy

Award amount

$99,444

Program and phase

STTR · Phase I

Award year

2010

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
MENLO SYSTEMS, INC.
Proposal award date
Not reported
Contract end date
2011-03-18
UEI
QHZ7ZZZS5KM8
Solicitation number
DE-FOA-0000161
Topic code
16 a

Research abstract

Long term stable and cost effective distribution of precision timing signals with better than 100-fs precision has been a challenging task for many years in fundamental and applied science. With the dawn of fourth generation light sources, such as seeded X-ray Free Electron Lasers (X-FEL), which are currently in design and construction in the US and around the world femtosecond timing distribution has become an urgent need. Next generation light sources will generate, and in fact are already generating at FLASH, DESY, 10-fs EUV and later hard X-ray pulses that can be used to study a variety of scientific topics ranging from condensed matter physics, material sciences, and femtochemistry to studying the structure and function of large biomolecules, one of the holy grails in biophysics. It is obvious that such a facility will operate using the most advanced ultrashort pulse laser and accelerator technology available. Maximum performance of the facility can only be achieved if both the optical and radio-frequency driven sub-components are synchronized to each other with at first a few tens of femtosecond, but ultimately sub-femtosecond precision over extended durations (>24 hours). Commercial Applications and Other Benefits: The objective of the proposed work is to study the feasibility and identify the best approach towards developing a modular femtosecond timing distribution system for next generation accelerators and light sources. Finally, the necessary technology will be transferred from a university laboratory to a small business to make it available for the forthcoming DOE facilities. Key focus of such a system is long-term performance, i.e. timing stability must be maintained over at least 24 hours. The resulting timing distribution system must be scalable in terms of its precision and length, i.e. from the tens of femtoseconds needed today to sub-femtosecond precision over kilometers if distance in the future, cost efficient and robust.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

3 SBIR/STTR records share this UEI (2009–2011). Reported award amounts total $944,220. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.