SBIR/STTR Research Award

DEVELOPMENT OF A 100 MEGAWATT X-BAND RELATIVISTIC KLYSTRON

Award identifier ebf34fcacf964e0a814d448d664032fb42c56904c2dd98988610a16a07eebf46Awarding agency Department of Energy

Award amount

$600,000

Program and phase

SBIR · Phase II

Award year

1994

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Mds Company
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

FUTURE HIGH GRADIENT LINEAR PARTICLE COLLIDERS OPERATING AT X-BAND WITH ACCELERATION GRADIENTS EXCEEDING 100 MEV/M REQUIRE RADIO FREQUENCY (RF) SOURCES CAPABLE OF GENERATING HIGH PEAK POWER AT HIGH EFFICIENCY. TO MEET THIS NEED, ANALYSIS, COMPUTER SIMULATION, AND RF TESTING WILL BE USED TO DESIGN A 100 MW RELATIVISTIC KLYSTRON OPERATING AT 11.424 GHZ WITH 120 HZ PULSE REPETITION RATE AND A MINIMUM PULSE WIDTH OF 1.0 MICROSECOND. THE ANALYSIS, DESIGN AND SIMULATION WILL BE BASED ON CONVENTIONAL KLYSTRON THEORY. IN PHASE I, A LOW PERVEANCE ELECTRON GUN CAPABLE OF GENERATING A SOLID ELECTRON BEAM FROM A THERMIONIC CATHODE OPERATING IN ULTRA HIGH VACUUM WILL BE DESIGNED AS WELL AS AN ELECTROMAGNETIC-ELECTRON BEAM INTERACTION CIRCUIT CAPABLE OF PRODUCING 100 MW WITH A MINIMUM SATURATED GAIN OF 50 DB AND A MINIMUM EFFICIENCY OF 50%. A MULTIPLE CAVITY OUTPUT CIRCUIT CAPABLE OF EFFICIENTLY EXTRACTING THE FUNDAMENTAL RF POWER FROM THE ELECTRON BEAM WILL BE DESIGNED AND ANALYZED FOR POSSIBLE RF ELECTRIC FIELD BREAKDOWN. HIGH THERMAL CAPABILITY, LONG LIFE AND ROBUST CONSTRUCTION WILL BE EMPHASIZED. ALL CAVITIES INCLUDING THE MULTI-CAVITY OUTPUT CIRCUIT AND AN OUTPUT WAVEGUIDE ASSEMBLY WITH MULTIPLE CERAMIC WINDOWS WILL BE DESIGNED, FABRICATED AND RF TESTED. IN PHASE II, THE MECHANICAL DESIGN, FABRICATION AND RF TESTING OF THE VARIOUS SUBASSEMBLIES WILL BE COMPLETED AND THIS 100 MW X-BAND RELATIVISTIC KLYSTRON AMPLIFER WILL BE ASSEMBLED AND TESTED.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.