SBIR/STTR Research Award

Oil Free Bearings for APUs

Award identifier 9a4d897747e31c9ca56ad377a78837f9e82b2893efc637b24c2c166fab983b96Awarding agency Department of Defense · Air Force

Award amount

$99,101

Program and phase

SBIR · Phase I

Award year

1997

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
MOHAWK INNOVATIVE TECHNOLOGY, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
ZY3GYFN4ELC4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

Active magnetic bearings (AMBs) make potentially reveolutionary Auxiliary and Integrated power Units (APU/IPU) designs possible. However, their ability to sustain and operate through transient events, while remaining both small and lightweight is restricted. Since APU/IPU size, weight and reliability are crucial flight worthy design issues, a durable compact backup bearing system is needed. Moawk Innovative Technology, Inc. (MiTI) proposes development of a lightweight Zero Clearance Auxiliary Bearing (ZCAB) suitable for high-speed high-temperature rotor systems. MiTi has already demonstrated the ZCAB at speeds to 10,000 rpm, under simulated shock, under simulated AMB failure and has a patent pending for this backup bearing. Under this proposed program, MiTi will 1) refine he ZCAB design for high speed IPU operation; 2) conduct design tradeoff studies to optimize the total bearing package size and weight for the advanced IPU under development by Sundstrand; 3) select the ZCAB tribomaterials system needed to assure adequate life; and 4) prepare a preliminary design of a high speed simulator test rig of the Sundstrand IPU to verify ZCAB operation throughout the required operating envelope. The support of Sundstrand Aerospace has been enlisted for Phase I to provide guidance and review the preliminary integrated ZCAB system design. Under Phase II a prototype integrated AMB/ZCAB system will be fabricated and tested under both steady state and transient conditions to verify the integrity of the design for ultimate demonstration in the Sundstrand IPU during a Phase III activity.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

105 SBIR/STTR records share this UEI (1995–2022). Reported award amounts total $40,033,528. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, Department of Health and Human Services, National Science Foundation, Department of Commerce

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.