SBIR/STTR Research Award

PLASMA CONTAINMENT SCHEME FOR HIGH THRUST DENSITY ION ENGINES

Award identifier c8ac1b173a529c1a45ec333522adaa6658b62ed9d14f1bbf3f4df7dd82d4fd33Awarding agency Department of Defense · Missile Defense Agency

Award amount

$499,000

Program and phase

SBIR · Phase II

Award year

1988

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Missile Defense Agency
Recipient company
Electric Propulsion Laboratory, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
D4AEK4RNERG4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

PRESENT ION ENGINE TECHNOLOGY IS LIMITED IN ENGINE THRUST DENSITY AND EFFICIENCY BY ENERGY EXPENSIVE PLASMA PRODUCTION PROCESSES AND BY ION ACCELERATOR SYSTEM DESIGNS WHICH LIMIT THE ATTAINABLE BEAM CURRENT DENSITY. IN ADDITION, NO EFFORTS HAVE BEEN MADE TO ENHANCE THE BASIC LOW OPERATING TEMPERATURE POTENTIAL OF THE ENGINE CONCEPT TO CREATE ANENGINE DESIGN WITH LITTLE OR NO INFRARED SIGNATURE. CONVENTIONAL ION ENGINE ACCELERATOR SYSTEMS CANNOT PROVIDE BOTH HIGH BEAM CURRENTS AND HIGH BEAM ENERGY AND A NEW APPROACH IS REQUIRED. PROOF-OF-PRINCIPLE TESTS ARE BEING PERFORMED ON A LOW LOSS PLASMA CONTAINMENT CONCEPT THAT MAY BE SUITABLE FOR HIGH EFFICIENCY DISCHARGE CHAMBER OPERATION IN A 50 KW ELECTRIC PROPULSION ENGINE BASED ON THE ELECTROSTATIC ION ACCELERATION PROCESS. THIS PLASMA CONTAINMENT CONCEPT IS NOT ANTICIPATED TO BE SUBJECT TO THE NORMAL ION AND ELECTRON LOSS CHARACTERISTICS. ION FLUX LEVELS CAPABLE OF SUPPORTING UP TO A 50 AMPERE ION BEAM ARE BEING ESTABLISHED USING THIS PLASMA CONTAINMENT SCHEME FOR TEST PERIODS OF UP TO SEVERAL HOURS. AN ION ACCELERATOR SYSTEM CAPABLE OF PROVIDING HIGH THRUST DENSITY AND HIGH SPECIFIC IMPULSE IS BEING DESIGNED TO MATE TO THIS DISCHARGE CHAMBER. THIS ACCELERATOR SYSTEM INCORPORATES DESIGN FEATURES WHICH ARE EXPECTED TO ELIMINATE ELECTRODE GAP CHANGES UNDER HIGH BEAM POWER CONDITIONS.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

23 SBIR/STTR records share this UEI (1986–2000). Reported award amounts total $4,955,819. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.