SBIR/STTR Research Award

NOVEL TWO-STAGE FLOTATION COLUMN DESIGN AND TESTING

Award identifier 39cc8b0eed73ddd5ee9de7157a3c755985e76adcbcf22a6f3f0db28564f117eeAwarding agency Department of Energy

Award amount

$37,967

Program and phase

SBIR · Phase I

Award year

1990

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Process Technology Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

MECHANIZED MINING METHODS THAT INCREASE THE PROPORTION OF FINE COAL BEING FED TO CLEANING PLANTS HAVE CAUSED INCREASEDEMPHASIS TO BE PLACED ON IMPROVING THE EFFICIENCY OF FINE COAL PROCESSING EQUIPMENT, PARTICULARLY FROTH FLOTATION CIRCUITS. THE ADVANCED PHYSICAL COAL CLEANING TECHNOLOGIES BEING EVALUATED BY DOE AND EPRI ALSO INVOLVE FINE TO EXTREMELY FINE GRINDING OF THE COAL TO IMPROVE LIBERATION OFASH AND SULFUR. THEREFORE, DEVELOPMENT OF EFFICIENT FINE COAL CLEANING EQUIPMENT AND PROCESSES IS ALSO CRITICAL FOR COMMERCIALIZATION OF THOSE ADVANCED TECHNOLOGIES. THIS PROPOSAL OUTLINES A PROJECT FOR CONSTRUCTION AND TESTING OF A NOVEL TWO-STAGE FLOTATION COLUMN DEVELOPED BY PTI FOR FINECOAL CLEANING APPLICATIONS. THE PROTOTYPE DESIGN WILL BE SIMILAR TO CONVENTIONAL COLUMN DESIGNS IN TERMS OF GEOMETRY,AIR BUBBLE GENERATION AND FROTH WASHING CAPABILITIES. THE UNIQUE ASPECTS WILL BE THE FEED SLURRY ADDITION APPROACH AND THE DUAL CYLINDER CONSTRUCTION DESIGNED TO IMPROVE FROTHDRAINAGE AND REDUCE ENTRAINMENT OF CLAYS INTO THE FROTH PRODUCT. THE PHASE I PROJECT WILL INCLUDE PRELIMINARY TESTING OF THE TWO-STAGE COLUMN TO DETERMINE THE OPTIMUM OPERATING CONDITIONS AND FINAL DESIGN OF THE PROTOTYPE COLUMN. THE PROTOTYPE COLUMN WILL THEN BE TESTED HEAD-TO-HEAD AGAINST A CONVENTIONAL SINGLE-STAGE COLUMN WITH THE SAME GEOMETRY, AIR BUBBLE GENERATION METHOD AND FROTH HEIGHT CONTROLS TO DETERMINE IF THE TWO-STAGE DESIGN APPROACH ACTUALLY IMPROVESEFFICIENCY FOR A NUMBER OF DIFFERENT COAL FEEDS. ANY FUTUREPHASE II PROJECTS WOULD INVOLVE SCALE-UP OF THE COLUMN TO COMMERCIAL SIZE AND RESEARCH INTO THE NECESSARY AIR BUBBLE GENERATION, FROTH WASHING AND FROTH LEVEL CONTROL COMPONENTSREQUIRED TO PROVIDE THE OPTIMUM PERFORMANCE.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.