SBIR/STTR Research Award

3D INSPECTION OF CIT FIRST WALL SURFACES

Award identifier d27f6351a3a8f629b287e0fea09235338b5fa1b57b977d3b68d536d326c82e3aAwarding agency Department of Energy

Award amount

$46,092

Program and phase

SBIR · Phase I

Award year

1990

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Intelligent Automation Systems, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

SAFE OPERATION OF THE EXPERIMENTAL COMPACT IGNITION TOKAMAK (CIT) BEING CONSTRUCTED AT THE PRINCETON PLASMA LABORATORY REQUIRES INTEGRITY OF THE FIRST WALL SURFACES. THE GRAPHITE TILES LINING THE INTERIOR OF THE TORUS MAY CRACK, DELAMINATE, OR BREAK COMPLETELY OFF. RATHER THAN MANUALLY INSPECTING THE SURFACES OR USING DETECTION OF CONTAMINANTS IN THE PLASMA TO DETERMINE THE LOSS OF TILE INTEGRITY, A PROPRIETARY THREE-DIMENSIONAL SENSING SYSTEM MAY BE USED TO LOCATE DEFECTS. BY COMPARING THE MEASURED SURFACES WITH AN IDEAL SURFACE, DEVIATIONS MAY BE IDENTIFIED AND PRESENTED TO OPERATORS. THE PHASE I PROJECT INCLUDES A REQUIREMENTS STUDY OF THE FIRST-WALL-INSPECTION PROBLEM, ANALYSIS OF THE SENSOR GEOMETRY, AND PRELIMINARY INSPECTION OF GRAPHITE TILES IN THE LABORATORY USING A PROTOTYPE SENSOR.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.