SBIR/STTR Research Award

SBIR Phase I: High-Precision Timing Devices for Research and Industry

Award identifier d1692492dea004ad8230466dd56600df1649b692af4b0a01f29f009667f0e0d7Awarding agency National Science Foundation

Award amount

$305,000

Program and phase

SBIR · Phase I

Award year

2025

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
Main Engineering LLC
Proposal award date
2025-03-21
Contract end date
2026-06-30
UEI
GSX3L6CQDVR4
Solicitation number
NSF 24-579
Topic code
S

Research abstract

The broader impact/commercial impacts of this Small Business Innovation Research (SBIR) Phase I project is in developing timing devices with increased performance and capability. These timing devices, capable of picosecond accuracy (a trillionth of a second), enable nuclear physics research, light detection and ranging, and medical imaging. This project will develop a time-to-digital converter (TDC) with unique features and the capability to operate in harsh environments. A TDC is an electronic device that measures time intervals with extremely high precision and converts the measured time into a digital value. TDCs are widely used in applications requiring precise timing, such as LIDAR, high-energy physics, medical imaging, and communications. The market opportunities and the competitive advantage are secured through an architecture that overcomes the limitations of current TDC implementations. The developed TDCs will be semiconductor chip based that will be fabricated domestically and introduced to three primary markets: nuclear physics, spacecraft instrumentation, and medical imaging devices. This Small Business Innovation Research (SBIR) Phase I project is a high-availability TDC that features zero dead-time, unlimited multi-hits, picosecond accuracy, and a dedicated calibration circuit. A proof-of-concept already exists, and a prototype application-specific integrated circuit is ready for fabrication. Phase I addresses research and development of hardware and software and overall robustness to withstand high radiation and cryogenic temperatures. This will be achieved through an iterative design methodology between logic design, transistor design, and transistor layout, each in their respective software environment. At the conclusion to Phase I, the primary goal is to have a second prototype ready to send to a chip fabrication facility. This prototype will include new features of the design, as well as radiation hardening. The radiation hardening will all

Technology keywords

Not reported

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.