SBIR/STTR Research Award

A Plasma Opening Switch Model for Power Flow Electrical Circuit Design

Award identifier 360dd0b8531de4de0fb9b32947ed7584cf52efacc3b391677e61f3f9d1499d2dAwarding agency Department of Defense · Defense Threat Reduction Agency

Award amount

$58,461

Program and phase

SBIR · Phase I

Award year

1993

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Defense Threat Reduction Agency
Recipient company
BERKELEY RESEARCH ASSOC., INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

A NEW PLASMA OPENING SWITCH (POS) MODEL IS PROPOSED FOR IMPLEMENTATION INTO AN ELECTRICAL CIRCUIT COMPUTER CODE. THE UNIQUE APPROACH DESCRIBED IN THIS PROPOSAL INCORPORATES A SEGMENTED SHEATH MODEL INTO THE EXISTING MAGNETOHYDRODYNAMICG (MHD) CODEPRISM DEVELOPED BY BERKELEY RESEARCH ASSOCIATES, INC. THE VERSION PROPOSED FOR PHASE I INCLUDES 1) TWO-DIMENSIONAL MHD MOTION OF THE BULK PLASMA; 2) RELATIVISTIC, EQUILIBRIUM ELECTRON MOTION IN THE SHEATH; 3) DYNAMIC ION MOTION IN THE SHEATH; AND 4) SOLUTIONS TO GAUSS'S LAW AND AMPERE'S LAW IN THE SHEATH. THIS FORMULATION IS CAREFULLY CHOSEN TO BALANCE INCLUSION OF THOSE BASIC PHYSICAL FEATURES BELIEVED PRESENT IN LONG CONDUCTION TIME OPENING SWITCHES WITH COMPUTATIOTIAL EFFICIENCY. THE INFORMATION REQUIRED FOR THE POS-CIRCUIT MODEL WILL BE THE INITIAL PLASMA STATE, THE GEOMETRY, AND CIRCUIT PARAMETERS FOR THE GENERATOR AND THE LOAD. THERE ARE NO OTHER FREE PARAMETERS. A SINGLE FOB MODEL ENCOMPASSES BOTH THE CONDUCTION AND OPENING PHASES RATHER THAN USING SEPARATE MODELS FOR EACH PHASE. IN PHASE I, THE FOB MODEL WILL BE EMBEDDED IN A CIRCUIT CODE WHICH WILL BE COMPRISED OF RLC CIRCUIT AND TRANSMISSION LINE MODULES TO REPRESENT THE GENERATOR AND LOAD. RESULTS FROM THIS MODEL WILL BE COMPARED TO EXISTING EXPERIMENTS SUCH A DPMI AT THE PHYSICS INTERNATIONAL COMPANY, ACE 4 AT MAXWELL LABORATORIES, AND HAWK AT NRL.

Technology keywords

Not reported

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.