SBIR/STTR Research Award

DIELECTRIC WALL LINAC INSULATOR FOR COMPACT (MEV) ELECTRON BEAM SOURCES

Award identifier 809b767eeaa3267442bae1919aa4c02d166ec2a3592f0b094369348176ffced7Awarding agency National Science Foundation

Award amount

$49,859

Program and phase

SBIR · Phase I

Award year

1993

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Science Foundation
Branch
Not reported
Recipient company
Tetra Corporation
Proposal award date
Not reported
Contract end date
Not reported
UEI
DQDEMSJD89L5
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THERE ARE MULTIPLE APPLICATIONS FOR COMPACT PARTICLE ACCELERATORS, ESPECIALLY HIGH ENERGY [TENS OF MEV] AND HIGH CURRENT [KA] OUTPUT. GRADIENTS OF 10 TO 20 MV/M ARE POSSIBLE ONLY WITH RF ACCELERATORS. EXISTING LINEAR INDUCTION ACCELERATORS (LIAS) DO NOT OPERATE AT OVER 1 MV/M. RESEARCHERS ARE DEVELOPING AN INSULATOR TECHNOLOGY TO SUPPRESS AND ENHANCE VACUUM SURFACE FLASHOVER. THE TECHNOLOGY OPERATES UP TO THE GAP'S VACUUM BREAKDOWN STRENGTH 40 MV/M AT 100 NS LONG PULSES, WITH THE ESTIMATED THEORETICAL LIMIT IN THE 100S OF MV/M RANGE. THE TECHNOLOGY FOR USE IN LINEAR INDUCTION ACCELERATORS AND DIELECTRIC WALL INDUCTION LINACS IS BEING DEVELOPED. THE TECHNOLOGY HAS BEEN DEMONSTRATED FOR USE AS A VACUUM DIELECTRIC INSULATOR FOR GRADIENTS OF 40 MV/M AT PULSE LENGTH OF 100 TO 200 NSEC. THERE IS EVIDENCE THAT AT SHORTER PULSES (10 TO 50 NSEC OR SHORTER), THE BREAKDOWN STRENGTH INCREASES. DESIGN IS EXTENED TO INCLUDE A BETTER STRUCTURAL PROTECTION AND THE ABILITY TO BE DRIVEN WITH A HIGH CURRENT SINGLE PULSE SOURCE OR RF.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

54 SBIR/STTR records share this UEI (1983–1996). Reported award amounts total $9,185,480. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, National Aeronautics and Space Administration

Agency intelligence

National Science Foundation

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.