SBIR/STTR Research Award

Utilization of Isotruss Technology in Taller Wind Turbine Towers

Award identifier 95508a54be7773f0c78fe198d24d546f7644406e2f705f5c250ea8d923cab117Awarding agency Department of Energy

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2002

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Wasatch Valley Technologies, Llc
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

70465 Two trends are creating the demand for taller wind towers: (1) the desire to access stronger winds for all sizes of turbines, and (2) the utilization of larger MW turbines, which necessitates longer rotor lengths. However, the construction, shipment, and installation of the large and heavy steel tower sections make current tower designs impractical for increased heights. These costs rise exponentially with the height of the tower. For example, for an 85m tower, these costs can be $382,000 for a 1.5 MW turbine. However, the same variables for a 5 MW turbine, 165M tower can be over $3,000,000. This project will design, analyze, and test a new technology for constructing taller support towers for wind turbines that overcomes the current crane and transportation limitations. The resulting analyses and test results will be compared to traditional steel towers to determine manufacturing, erection, and overall costs for wind turbine tower options. Phase I will design and analyze a patented carbon fiber geometry design for use in high (86 to 156 meter) wind turbine support towers. A cost analysis will be used to compare the new technology with steel for 1.5 MW to 5 MW wind turbine towers. Commercial Applications and Other Benefits as described by the awardee: Compared to 5 MW turbine steel towers, the new technology should lower tower costs by 53%, allowing higher towers to be built.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.