SBIR/STTR Research Award

Innovative Modular, Multiple Power Levels, 325 MHz Spokes Cavities Power Couplers

Award identifier 9750a891444373d7b724d541c5fefcec5fcae918b398ccd9df83a429d214a483Awarding agency Department of Energy

Award amount

$99,993

Program and phase

SBIR · Phase I

Award year

2005

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Amac International, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
DE-FG02-06ER06-09
Topic code
37

Research abstract

79766S05 In order to increase proton energy up to 8 GeV in a driver linear accelerator, particles must be accelerated through various stages and three different power levels (25kW, 100 kW, and 210kw). Unfortunately, no power coupler element for these cavities has ever been produced using U.S. industrial capabilities. This project will develop innovative modular, multiple power level, 325 MHz spoke cavities power couplers. Phase I will optimize and define the parameters for 325Mhz couplers with alternative planar, cylindrical, or conical windows. Calculations will be made to determine the radio frequency parameters, and to investigate the thermal and stress of the window designs. The calculation will minimize the heat losses to the 4K He cooling system, an assessment of advantages of electric-field vs. magnetic-field coupling will be performed, and a preliminary design concept of a high reliability 100 kW coupler with modular components will be performed. Commercial Applications and Other Benefits as described by the awardee: The modular component design should significantly reduce fabrication costs for the 110 power couplers required for the Fermilab Proton Driver. This modular universal design could be the model for any future cost saving applications in many DOE and industrial accelerator projects.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.