SBIR/STTR Research Award

DEVELOPMENT OF A PULSED MHD SOURCE FOR ELECTROMAGNETIC SOUNDING

Award identifier ec2ccadd4fd00674983c81543d0cc73fdd621a9e137b626cd0a056de65f4677eAwarding agency Department of Energy

Award amount

$49,999

Program and phase

SBIR · Phase I

Award year

1991

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Hmj Corp.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

INFORMATION OBTAINED FROM THE MEASUREMENT OF THE ELECTRICAL CONDUCTIVITY OF THE EARTH'S CRUST IS OF GREAT VALUE IN THE EXPLORATION FOR AND THE DELINEATION OF RESOURCES. THIS INFORMATION CAN ALSO SIGNIFICANTLY ENHANCE UNDERSTANDING OF THE EVOLUTION OF THE CRUST, ITS CURRENT COMPOSITION AND STRUCTURE, AND THE FORCES WITHIN IT. THE PREFERRED METHOD OF ELECTROMAGNETIC SOUNDING (EMS) IS TO INDUCE AN ELECTRIC CURRENT AT THE SURFACE AND MEASURE INDUCED MAGNETIC FIELDS AS THIS PULSE DIFFUSES AND DECAYS INTO THE CRUST. TO MAKE USE OF THE FULL CAPABILITIES OF AN EMS SYSTEM, A PORTABLE, HIGH POWER PULSE SOURCE AND A DETECTION SYSTEM WITH A HIGH SIGNAL-TO-NOISE DETECTION CAPABILITY ARE REQUIRED. CURRENTSWITH PEAK AMPLITUDES IN THE RANGE OF 10 KA AND ABOVE WITH DURATIONS OF A FEW SECONDS ARE REQUIRED. USUALLY, AN INDEPENDENT SOURCE MUST BE PROVIDED AT EMS SITES BECAUSE THEY LACK ELECTRIC UTILITY GRID CAPABILITY. THE MAGNETOHYDRODYNAMIC (MHD) GENERATOR IS IDEALLY SUITED FOR THIS KIND OF DUTY. COMBINED WITH AN EMS SYSTEM, THE MHD GENERATOR CAN GREATLY INCREASE THE DIPOLE MOMENT OBTAINABLE AND YIELD SUBSTANTIAL IMPROVEMENTS IN PERFORMANCE. PHASE I OF THIS PROJECT INVOLVES A SYSTEM STUDY TO OPTIMIZE AN EMS SYSTEM USING AN APPROPRIATELY MODIFIED EXISTING PULSED MHD GENERATOR, A DEFINITION OF THE INSTRUMENTATION AND DATA HANDLING SUBSYSTEM REQUIRED, AND THE SELECTION OF A FIELD TEST PROGRAM FOR A PHASE II PROTOTYPE SYSTEM DEMONSTRATION. THE OVERALL EMS-MHD SYSTEM PERFORMANCE WILL BE ESTABLISHED, THE ECONOMICS OF THE METHOD WILL BE ASSESSED AND THE STEPS TO BE TAKEN TO ENSURE THAT IT MEETS APPLICABLE ENVIRONMENTALREGULATIONS WILL BE IDENTIFIED.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.