SBIR/STTR Research Award

Fast Ferroelectric L-Band Tuner for ILC Cavities

Award identifier ac5c6b8086b914a7b3bc536fe901b5226f22e64d7de0046c9206765cf62cd00fAwarding agency Department of Energy

Award amount

$650,000

Program and phase

SBIR · Phase II

Award year

2007

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Omega-P, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
DE-FG01-05ER05-28
Topic code
37

Research abstract

The international accelerator community is focused on the development of the next electron-positron collider, the International Linear Collider (ILC), which will be based on superconducting radio frequency (RF) technology. This project will develop a fast ferroelectric tuner for ILC cavities. The tuner will permit adjustments, during each RF pulse of cavity coupling, to compensate for unavoidable microphonics and Lorentz force detunings, and to reduce the total RF power needed. As a result, a number of benefits will accrue: (1) the refrigeration power needed to remove waste heat from the cavities will be reduced, (2) the cavity can remain on resonance at the operating frequency and maintain precise phase, and (3) both the cavity filling and decay times can be shortened. In Phase I, the design of a coaxial phase shifter for the L-band tuner for ILC cavities was completed. The design included specifications for a ferroelectric ring and alumina rings, a coaxial impedance transformer, a waveguide-to-coax coupler, thermal considerations, and temperature stabilization requirements. In Phase II, the L-band coaxial phase shifter for the tuner will be fabricated and tested at Fermi National Accelerator Laboratory. Commercial Applications and Other Benefits as described by the awardee: A fast ferroelectric tuner would be needed for each of the 10,000 superconducting cavities of the ILC. In mass production, a tuner price of $500 should be achieved, yielding a potential market in the range of $5 milliion. Other applications are envisioned in other accelerators, including industrial machines, increasing the size of the potential market.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.