SBIR/STTR Research Award

Geotechnical Regolith Advanced Site Preparation (GRASP)

Award identifier de610e481567cf244cf4d24c106442ac90f2b95a7c16a8011f3d9f3c8505c92cAwarding agency National Aeronautics and Space Administration

Award amount

$849,951

Program and phase

STTR · Phase II

Award year

2025

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
CISLUNE INC
Proposal award date
2025-02-25
Contract end date
2027-02-24
UEI
DGPTTY66S627
Solicitation number
STTR 2023-II
Topic code
T7

Research abstract

For Cislunes Phase II STTR Proposal, Rover Wheel Compaction and Analysis Framework, we will significantly advance the development of optimized rover wheel designs and geotechnical methods to enable the construction of durable regolith-based infrastructure on the lunar surface. In Phase I, the team found a wheel design capable of increasing the Cone Penetrometer Index (CPI) by 20%, proving that wheel topology has a direct and significant impact on compaction. Building on these successes, we will refine Discrete Element Method (DEM) simulations in conjunction with topology optimization techniques to create wheel topologies that maximize compaction. This optimization is essential for maximizing compaction efficiency, minimizing slippage, and ensuring the creation of engineered surfaces capable of supporting heavy loads. These wheels and the algorithms designed in Phase I will be integrated into a sophisticated robotic excavation system, equipped with real-time, modular geotechnical characterization tools, including a bevameter, and wheel drive system telemetry capable of predicting the CPI. These tools will continuously monitor and assess the mechanical properties of the regolith during the construction process, allowing for dynamic adjustments to excavation and compaction operations. The topology-optimized wheel designs will ensure optimal interaction with lunar regolith, resulting in stable, load-bearing surfaces that meet stringent requirements for lunar missions. The project will culminate in a full-scale demonstration of the robotic construction of a compacted regolith landing pad and surrounding berm, providing critical validation of the technologies developed and their readiness for deployment in NASAs Artemis program. This work aims to equip NASA with the tools necessary to establish permanent, safe, and reliable infrastructure in the challenging lunar environment, supporting the broader objectives of sustained human exploration and settlement on the Moon.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

13 SBIR/STTR records share this UEI (2021–2025). Reported award amounts total $3,453,572. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.