SBIR/STTR Research Award

ROBOTIC WALL SCRUBBER FOR NUCLEAR REACTOR WELLS AND FUEL STORAGE POOLS

Award identifier 71e22b646df9cc15ba407bf0b9450a11e9968dd2872f5dabae68cacea37d2028Awarding agency Department of Energy

Award amount

$49,989

Program and phase

SBIR · Phase I

Award year

1990

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
KARTA TECHNOLOGIES
Proposal award date
Not reported
Contract end date
Not reported
UEI
HC6QJAM2F4E3
Solicitation number
Not reported
Topic code
Not reported

Research abstract

DURING THE REFUELING OPERATIONS AT A NUCLEAR POWER PLANT, IT IS NECESSARY TO FLOOD LARGE CAVITIES ABOVE THE REACTOR PRESSURE VESSEL WITH WATER TO PROVIDE RADIATION SHIELDING. THE SPENT FUEL IS TRANSPORTED THROUGH THESE CAVITIES TO A TEMPORARY STORAGE POOL LOCATED NEAR THE REACTOR. OTHER CONTAMINATED INTERNAL REACTOR COMPONENTS ARE ALSO STORED WITHIN THESE CAVITIES DURING REFUELING. ONCE THE REFUELING OPERATION ARE COMPLETE, THE CAVITIES ARE DRAINED, AND THE REACTOR VESSEL IS REASSEMBLED. BECAUSE RADIOACTIVE PARTICLES BECOME SUSPENDED IN THE WATER AND ADHERE TO THE STAINLESS STEEL LININGS OF THE CAVITIES THEY MUST BE REMOVEDBEFORE THE LINING IS ALLOWED TO DRY IN ORDER TO PREVENT PARTICLES FROM BECOMING AIRBORNE CONTAMINATES. CLEANING THE LARGE SURFACE AREAS IS PERFORMED BY WORKERS WEARING PROTECTIVE CLOTHING WHO MUST CAREFULLY WIPE THE WALL SURFACES WITH CLEAN TOWELS. BOTH TOWELS AND WORKERS GARMENTS BECOME CONTAMINATED AND REQUIRE SPECIAL HALDLING. THIS TIME CONSUMING TASK CAN ADD SEVERAL DAYS TO A REFUELING OUTAGE. THE PRESENT PRACTICE NOT ONLY INCREASES THE COST OF THE OUTAGE IT ALSO EXPOSES WORKERS TO A HAZARDOUS RADIOACTIVE ENVIRONMENT AND CREATES LOW LEVEL WASTE MATERIALS. A RECENT STUDY BY EPRI RATED THE DEVELOPMENT OF A ROBOTIC SYSTEM TO CLEAN/SCRUB REACTOR WELLSAND FUEL STORAGE POOLS A TOP PRIORITY. IT IS PROPOSED TO DESIGN AN END-EFFECTOR (CLEANING HEAD) AND USE EXISTING ROBOTICS TECHNOLOGY AND RADIOACTIVE DETECTION DEVICES TO DEVELOP A CLEANING SYSTEM TO REDUCE WORKER EXPOSURE, CLEANING TIME, AND LOW LEVEL WASTE MATERIAL.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

32 SBIR/STTR records share this UEI (1987–2006). Reported award amounts total $6,505,670. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration

Contractor profile

EMPOWER AI, INC.

Historical federal award activity, when published, is on that contractor profile. Matched by UEI only.

Agency intelligence

Department of Energy

NAICS intelligence

This classification comes from the contractor profile, not from the SBIR award record.

Contractor industry classification NAICS 518210

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.