SBIR/STTR Research Award

PHOTONIC SWITCHING FOR INTERCONNECTION OF EVENT SCANNERS TO EVENT PROCESSORS

Award identifier 279cd240ce041b2bd76ce7e6be367050f807803ca96f116577c22a3dc212ceb4Awarding agency Department of Energy

Award amount

$500,000

Program and phase

SBIR · Phase II

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Optical Networks Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

A SIGNIFICANT PROBLEM ENCOUNTERED IN PROCESSING DATA COLLECTED BY HIGH ENERGY PARTICLE ACCELERATORS, SUCH AS THE SUPERCONDUCTING SUPER COLLIDER (SSC), IS THE INTERCONNECTION OF A LARGE NUMBER OF EVENT SCANNERS (DETECTORS) TO A LARGE NUMBER OF EVENT PROCESSORS (COMPUTERS). VERY HIGH DATA RATES, INCREASING DISTANCES BETWEEN SENSORS AND PROCESSORS, AND ISOLATION FROM ELECTROMAGNETIC INTERFERENCE FAVOR FIBER OPTIC INTERCONNECTIONS. PHOTONIC SWITCHING (AS OPPOSED TO ELECTRONIC SWITCHING), WHICH MAY BE REQUIRED AT SOME THRESHOLD OF DATA RATES, IS DESIRABLE IN ORDER TO ELIMINATE THE EXTRA OPTICAL-TO-ELECTRONIC CONVERSION REQUIRED FOR ELECTRONIC SWITCHING. THIS PROJECT IS EXAMINING THE USE OF PHOTONIC SWITCHING FOR ROUTING SUCH DATA, ALLOWING THE COLLECTION OF ALL FRAGMENTS OF EVENTS (FROM DIFFERENT DETECTORS) AT SEPARATE PROCESSORS FOR EACH EVENT. ALTERNATIVE SWITCH ARCHITECTURES AND TECHNOLOGIES BASED ON EXPERIENCE IN PHOTONIC SWITCHING ARE BEING STUDIED AND THEY INCLUDE THE OPTICAL MATRIX-VECTOR MULTIPLIER, THE OPTICAL BARREL SHIFTER, AND A SCALABLE SWITCH DESIGN BASED ON SWITCHABLE SPLITTERS AND COMBINERS. THIS UNIQUE PROPRIETARYSWITCH DESIGN, WHICH COULD MAKE A SIGNIFICANT CONTRIBUTION TO SOLVING THE STATED PROBLEM, IT IS RECOMMENDED BASED ON THE CURRENT UNDERSTANDING OF THE SSC REQUIREMENTS IN TERMS OF NUMBER OF NODES, SWITCH RECONFIGURATION TIMES, AND LOSS AND CROSSTALK PARAMETERS. THE PHASE I APPROACH INCLUDES A DEFINITION OF REQUIREMENTS, SWITCH ARCHITECTURE AND TECHNOLOGY TRADEOFFS, AND A PRELIMINARY DESIGN FOR THE PHOTONIC SWITCH. THE PHASE II EFFORT WILL INCLUDE A PROTOTYPE DEVELOPMENT AND DEMONSTRATION.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.