SBIR/STTR Research Award

REMOVAL OF HYDROGEN SULFIDE FROM NATURAL GAS BY ELECTRON BEAM IRRADIATION

Award identifier ad8fb40eb31a94032d945b605f92f75d38176d4e86528a04ab379f5096c98e43Awarding agency Department of Energy

Award amount

$749,994

Program and phase

SBIR · Phase II

Award year

1995

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Science Research Laboratory, Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
MKKPT9RCLJQ1
Solicitation number
Not reported
Topic code
Not reported

Research abstract

NATURAL GAS REPRESENTS 20% OF THE PRIMARY ENERGY RESOURCES OF THE UNITED STATES AND ACCOUNTS FOR ALMOST HALF THE ENERGY CONSUMED FOR RESIDENTIAL HEATING. 22% OF THE NATURAL GAS RESERVES IN THIS NATION ARE NOT USABLE BECAUSE THEY CONTAIN MORE THAN 4 PPM OF HYDROGEN SULFIDE (H2S). THIS CORRESPONDS TO 19 TRILLION CUBIC FEET OF THE KNOWN RESERVES. IT IS PROJECTED THAT 80 TRILLION CUBIC FEET OF THE UNDISCOVERED NATURAL GAS RESOURCES ARE ALSO CONTAMINATED WITH UNACCEPTABLE CONCENTRATIONS OF H2S. NATURAL GAS CONTAMINATED WITH H2S IS AN ENVIRONMENTAL HAZARD DUE TO THE TOXICITY OF H2S IN THE GAS ITSELF AND THE SULFUR-CONTAINING COMPOUNDS PRODUCED AND RELEASED DURING COMBUSTION. IN ADDITION, IT IS CORROSIVE TO PIPELINE SYSTEMS. CURRENT TECHNOLOGIES FOR H2S REMOVAL ARE COMPLEX AND COST BETWEEN 20 AND 26 CENTS PER MILLION STANDARD CUBIC FEET. THIS COST IS INDEPENDENT OF THE CONCENTRATION OF H2S. THE COST OF THE ELECTRON BEAM PROCESS, BASED ON ALL-SOLID-STATE ACCELERATORS, IS 6 CENTS PER MILLION STANDARD CUBIC FEET FOR NATURAL GAS CONTAINING 1000 PPM H2S. THE COST FOR THE ELECTRON BEAM PROCESS DECREASES TO 0.6 CENTS PER MILLION FOR NATURAL GAS CONTAINING ONLY 100 PPM. APPROXIMATELY 4.3 TRILLION CUBIC FEET OF THE NATURAL GAS RESERVES CONTAIN <100 PPM H2S AND 8.6 TRILLION CUBIC FEET CONTAIN <1000 PPM H2S. IN PHASE I THE EFFICIENCY OF H2S REMOVAL FROM NATURAL GAS BY ELECTRON BEAM IRRADIATION WILL BE DETERMINED. THESE PROOF-OF-PRINCIPLE EXPERIMENTS WILL BE PERFORMED ON AN EXISTING ALL-SOLID-STATE LINEAR INDUCTION ACCELERATOR. BASED ON THE DATA FROM THESE EXPERIMENTS, PHASE II DEMONSTRATION EXPERIMENTS WILL BE DESIGNED AND CONDUCTED TO DETERMINE THE TECHNICAL AND ECONOMIC VIABILITY OF USING ELECTRON BEAM IRRADIATION TO REMOVE H2S IN A FLOWING NATURAL GAS PIPELINE SYSTEM.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

228 SBIR/STTR records share this UEI (1984–2020). Reported award amounts total $66,288,679. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, Department of Health and Human Services, National Aeronautics and Space Administration, Department of Transportation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.