SBIR/STTR Research Award

PERFORMANCE OF SUPERCONDUCTING MAGNETIC BEARINGS IN AN ADVANCED MOMENTUM EXCHANGE EFFECTOR

Award identifier f695fde66bcd3d677a31f6b378a0dbfccd1d7d2ad727cfe517eb7267651006d9Awarding agency National Aeronautics and Space Administration

Award amount

$488,400

Program and phase

SBIR · Phase II

Award year

1989

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
RCT SYSTEMS, INC
Proposal award date
Not reported
Contract end date
Not reported
UEI
PXVSNHKR48E6
Solicitation number
Not reported
Topic code
Not reported

Research abstract

ANGULAR MOMENTUM EXCHANGE EFFECTORS HAVE SEVERAL ADVANTAGES OVER THRUSTERS. THESE INCLUDE REDUCED MAINTENANCE (FLUID MUST BE PERIODICALLY REPLACED) AND IMPROVED COMPATIBILITY WITH OPTICS (NO EFFLUENTS). HIGH-RATE SLEWING OF LARGE PAYLOADS, HOWEVER, WILL REQUIRE TORQUES (TENS OF THOUSANDS OF NEWTON-METERS) AND ANGULAR MOMENTUM STORAGE CAPACITIES (TENS OF THOUSANDS OF NEWTON-METER-SECONDS) THAT ARE LARGE IN COMPARISON TO THE CAPABILITIES OF AVAILABLE ANGULARMOMENTUM EXCHANGE HARDWARE. ONE REASON IS THAT HIGH TORQUE PRODUCES AN EXTREMELY DIFFICULT DESIGN CONSTRAINT FOR HIGH INSTRUMENT-GRADE MECHANICAL BEARINGS AND CONVENTIONAL MAGNETIC BEARINGS. FOR CONVENTIONAL MAGNETIC BEARINGS, HIGHTORQUES REQUIRE THAT THE MAGNETIC STRUCTURE BE EXCESSIVELY MASSIVE. AN ALTERNATIVE DESIGN EMPLOYS A SUPERCONDUCTING COIL IN THE MAGNETIC BEARING AND ELIMINATES ALL CONVENTIONAL MAGNETIC STRUCTURES IN ORDER TO PRODUCE A VIABLE HIGH-TORQUE MOMENTUMEXCHANGE EFFECTOR. THE MAGNETIC BEARING IS ALSO USED TO FULLY GIMBAL THE SUSPENDED ROTOR OF THE SLEW ACTUATOR. THE PROPOSED PHASE I RESEARCH WILL RESULT IN A DETAILED ANALYSISOF THE PERFORMANCE OF THIS ADVANCED CONTROL MOMENT GYRO. A LABORATORY DEMONSTRATION INCORPORATING CONVENTIONAL TECHNOLOGIES WILL ALSO BE DESIGNED DURING PHASE I. CONSTRUCTION AND TESTING OF THE HARDWARE WILL BE PERFORMED AS A PHASE II EFFORT.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

193 SBIR/STTR records share this UEI (1986–2022). Reported award amounts total $43,313,716. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation, Department of Health and Human Services, Department of Transportation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.