SBIR/STTR Research Award

Method of Sand Control Completion for Cold Production in Heavy Oil Reservoirs Eliminating Perforating and Gravel Packing in Cased and Cemented Wellbores

Award identifier c25908721cddfc00868128c6724a5bb083ae94c4c6f3206d6e1b931752f55d8cAwarding agency Department of Energy

Award amount

$749,500

Program and phase

SBIR · Phase II

Award year

2003

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Completionconcepts
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

70132 Although cold production of heavy oil reservoirs can enhance oil production, the accompanying sand production presents environment problems related to the cleaning and disposal of the produced sand. Also, sand production can damage downhole pumps and surface equipment. A method of sand control is needed that not only protects well productivity and minimizes formation damage during well construction, but also eliminates the expense of perforating and gravel packing. This project will develop a telescoping preformed perforation containing a sand control medium. The device and associated methods of application will maintain heavy oil productivity during cold production while eliminating sand production. In Phase I, operators were interviewed to determine the optimum form and function of the telescoping member, a hydraulically actuated, preformed, telescoping perforation tunnel was designed, and prototype devices were built. A sand control medium for heavy oil reservoirs was integrated into the telescoping perforation. Lastly, the permeability of the sand control medium was determined, along with the hydraulic actuation pressures of the prototype. Phase II will focus on: (1) reliability, in terms of corrosion and erosion resistance, productivity and flow assurance, and casing attachment methodology; (2) system development, including the incorporation of cementing equipment and cementing methodology and field handling equipment; and (3) manufacturing issues, including the incorporation of the sand control medium into a scaled-up telescoping housing. Commercial Applications and Other Benefits as described by awardee: Eliminating perforating and gravel packing while maintaining well productivity could significantly lower development costs for operators. Although cold production in heavy oil reservoirs is the target application, the technology could significantly reduce costs associated with perforating and gravel packing during well construction and completion operations in the Gulf of Mexico and Alaska.¿ The elimination of sand production also would have a positive impact on environmental and safety concerns.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.