SBIR/STTR Research Award
AN INTEGRATED DRILLING/COMPLETION SYSTEM FOR OFFSHORE GAS HYDRATES
Award amount
$499,969Program and phase
SBIR · Phase IIAward year
1992Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- Waterjet Technology Inc
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
THIS RESEARCH EVALUATES THE FEASIBILITY OF USING AN INTEGRATED DRILLIN/COMPLETION SYSTEM FOR EXPLORATION, TESTING, AND PRODUCTION OF OFFSHORE NATURAL GAS HYDRATES. THE DRILLING SYSTEM IS BASED ON A LOW POWER HYDRAULICALLY DRIVEN MOTOR DESIGNED FOR DRILLING IN HOMOGENEOUS SOFT SEDIMENTS AND HYDRATE-BEARING SEDIMENTS. THIS PROJECT IS DESIGNING A COMPLETION SYSTEM THAT CAN BE INTEGRATED WITH THE DRILL TO ALLOW LOW COST EXPLORATION OF OFFSHORE GAS HYDRATE ACCUMULATIONS FROM A CONVENTIONAL OIL FIELD SUPPLY VESSEL. THE PHASE I FEASIBILITY STUDY ADDRESSES THE ISSUES OF OFFSHORE HYDRATE OCCURRENCE, SEDIMENT GEOTECHNICAL PROPERTIES, BOREHOLE STABILITY CONTROL, AND COMPLETION TECHNIQUES FOR GAS HYDRATES.
Technology keywords
Not reported