SBIR/STTR Research Award

Design of Novel Induction Accelerator Gaps

Award identifier 1dc39e4f6629148e108999028ec4382a1cbb7476c43f5f15484841ff78911fabAwarding agency Department of Energy

Award amount

$75,000

Program and phase

SBIR · Phase I

Award year

1996

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Far-Tech, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
LZ6MNQGKZSV3
Solicitation number
Not reported
Topic code
Not reported

Research abstract

41018 November 19, 1996 Fusion and Accelerator Research This project will develop an acceleration gap, a key feature required to make future linear colliders technically and economically feasible. The acceleration gap must satisfy three major criteria: hold-off of the applied 100 kV voltage, low transverse impedance for beam break-up minimization, and low longitudinal impedance at the beam modulation frequency and harmonics to minimize power loss. Preliminary studies indicate that the transverse impedance should be less than 5400 Ohms/m, and longitudinal impedance for 11.4 giga-Hertz should be less than 2.5 Ohms/m. Phase I will explore various gap geometrics and materials to optimize the gap design. In addition, two novel design techniques will be introduced: (1) the use of a new insulator technology in which the insulator is comprised of thin layers of standard insulating material alternating with finely spaced floating metal electrodes, and (2) the use of thin metal films to cost standard ceramic insulators. These designs will lead to the manufacture and test of a prototype induction acceleration gap during Phase II. Anticipated Results/Potential Commercial Applications as described by the awardee: The acceleration gap design should satisfy the technical requirements for the two-beam next linear collider (TBNLC) induction cells and should lead to significant reductions in the construction and operational costs of induction accelerators. The technology could also apply to other induction accelerator applications, for example, Free Electron Laser drivers and material processing.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

79 SBIR/STTR records share this UEI (1995–2019). Reported award amounts total $24,887,995. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.