SBIR/STTR Research Award

A 200 kW, 350 MHz Inductive Output Tube for RF Accelerators

Award identifier 32879fad008ea6bed924d80f131086b045d58200e2416977e68e1e74c5ac9179Awarding agency Department of Energy

Award amount

$749,937

Program and phase

SBIR · Phase II

Award year

2008

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
CALABAZAS CREEK RESEARCH, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
M3LBSJNCR1Z5
Solicitation number
DE-PS02-06ER06-30
Topic code
15

Research abstract

RF sources are required for powering accelerators operating at approximately 350 MHz and for pro­viding 200 kW CW for each accelerator cavity. This project will develop a fundamental-mode, multiple-beam Inductive Output Tube (IOT) for potential accelerator applications. The advantage of multiple beams is the reduction in operating voltage required to propagate several beams down individual beam tunnels. In turn, the lower beam volt­age allows significant reduction in the power supply requirements and decreases the likelihood for electrical breakdown and x-ray generation. Combined with the IOT¿s inherent high efficiency, the multiple-beam IOT would be an extremely cost effective RF source for accelerator applications. Phase I developed preliminary designs for all major components and demonstrated feasibility. An analysis determined power supply, drive, mechanical, and performance spec­ifications. Phase II will finalize the design, then fabricate and test a prototype multiple beam IOT at full power. Commercial Applications and Other Benefits as described by the awardee: The multiple-beam IOT would operate at much higher effi­ciency and be considerably less expensive than the klystrons that are now used for numerous accelerator applications. The sig­nificantly lower operating voltage also would result in dramatic savings for the power supplies and ancillary equipment and facilities.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.