SBIR/STTR Research Award

ADVANCED PULSED POWER CIRCUITS FOR ION LINEAR INDUCTION ACCELERATORS

Award identifier 383a6c0dd88201c24fa50bff49eee1e0c8487e965864437a56ea680a7abbf6e2Awarding agency Department of Energy

Award amount

$499,849

Program and phase

SBIR · Phase II

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
North Star Research Corp.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THIS PROJECT IS DESIGNED TO DEMONSTRATE THE UTILITY OF VARISTOR AND NOVEL TUBE CIRCUITS AS A MEANS OF STABILIZING THE LONGITUDINAL BUNCHING INSTABILITY OF INTENSE ION BEAMS APPLIED TO ION BEAM FUSION. WORK AT LOS ALAMOS NATIONAL LABORATORY HAS DEMONSTRATED THAT ZINC OXIDE VARISTORS CAN BEUSED TO CONTROL THE VOLTAGE VARIATIONS ON AN INDUCTION ACCELERATOR CELL. MEASUREMENTS ARE BEING MADE ON VARISTORS IN ORDER TO DETERMINE THEIR LIFE AND TO PERFORM CIRCUIT SIMULATION STUDIES IN ORDER TO DEVELOP TECHNIQUES THAT CAN IMPROVE THE FIELD PENETRATION OF VARISTORS ON FAST TIME SCALES. A NOVEL VACUUM TUBE REGULATION TECHNIQUE IS ALSO PLANNED THAT MINIMIZES OR ELIMINATES UNDESIRABLE VOLTAGE FLUCTUATIONS CAUSED BY CURRENT FLUCTUATIONS. THIS TETRODE TECHNIQUE CAN ALSO BE USED FOR ZERO-ORDER SWITCHING OF THE PULSE POWER SYSTEM AND FOR FINE CONTROL OF THE VOLTAGE. NUMERICAL ELECTRON OPTICS STUDIES OF THIS TECHNIQUE ARE BEING PERFORMED DURING PHASE I, LEADING TO A DETAILED DESIGN OF A PHASE II EXPERIMENT. IF SUCCESSFUL, A COST-EFFECTIVE SOLUTION TO THE LONGITUDINAL INSTABILITY WILLRESULT FROM THIS WORK.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.