SBIR/STTR Research Award

COALBED METHANE PRODUCTION USING SHORT TO MEDIUM RADIUS HORIZONTAL WELLS

Award identifier 88ba631fac89f685f8868a7ad5c60d3e877e1d249657883cb9404ec71f87d72aAwarding agency Department of Energy

Award amount

$50,000

Program and phase

SBIR · Phase I

Award year

1988

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Northwest Fuel Development, In
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THE OBJECTIVE OF THIS PROJECT IS TO ADVANCE AN INNOVATIVE METHOD FOR COMMERCIALLY PRODUCING COALBED METHANE (CBM). CBM IS TYPICALLY PRODUCED USING CONVENTIONAL VERTICAL WELLS THAT HAVE BEEN HYDRAULICALLY STIMULATED TO ENHANCE THE FORMATION PERMEABILITY. THIS DOES NOT ALLOW FOR EFFICIENT REMOVAL OF THE TOTAL RESOURCE UNLESS DRILLING IS ACCOMPLISHED ON A CLOSE SPACING, WHICH ADVERSELY AFFECTS ECONOMICS. HORIZONTAL DRILLING FROM VERTICAL WELLS WILL PROVIDE THE BENEFIT OF ACCESS TO A LARGE PART OF THE COAL SEAM FROM A SINGLE WELL. IT WILL ALSO ALLOW ORIENTATION OF THE WELL TO ACHIEVE MAXIMUM GAS PRODUCTION. WITH THE EXISTING NATURAL FRACTURES IN COAL (CLEATS), HYDRAULIC FRACTURING FROM VERTICAL WELLS PROPAGATES PARALLEL TO THE PRIMARY FACE CLEATS. HORIZONTAL WELLS CAN BE ORIENTED PERPENDICULAR TO THE FACE CLEATS, LEADING TO MAXIMUM BENEFITFROM EXISTING FRACTURES. THE RESEARCH IN THIS PROJECT WILL ANSWER QUESTIONS REGARDING THE APPLICATION OF THIS DRILLING TECHNOLOGY TO CBM AND OTHER FRACTURED RESERVOIR PRODUCTION, INCLUDING THE TYPES OF DRILLING MUDS TO MAXIMIZE CBM PRODUCTION, THE TYPES OF DEWATERING TECHNIQUES TO BE USED, AND WHETHER THE ECONOMICS WILL JUSTIFY THE COST. THE RESEARCH WILL BE CARRIED OUT AT THE BIG RUN FIELD, WETZEL COUNTY, WV, BY REVITALIZING THIS FIELD, WHICH HAS PRODUCED OVER 2 BCF OF GAS FROM COALBEDS AT A DEPTH OF LESS THAN 1000 FEET. THE EXISTING WELLS HAVE DECLINED TO THE POINT WHERE THEY AVERAGE LESS THAN 1 MCFD PER WELL. THE RESULTS CAN ALSO BE TRANSPOSED TO OTHER SITES WHERE CBM PRODUCTION IS DECLINING, OR TO TOTALLY NEW SITES.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.