SBIR/STTR Research Award

A 17 GIGAHERTZ TRAVELING WAVE RELATIVISTIC KLYSTRON FOR HIGH GRADIENT ACCELERATORS

Award identifier 8bfad060707f336f35f82ee72754ee029f39f16dcc8e16a8dde1d4e731e89352Awarding agency Department of Energy

Award amount

$500,000

Program and phase

SBIR · Phase II

Award year

1993

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Haimson Research Corporation
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

PARAMETRIC STUDIES OF NEXT-GENERATION ELECTRON LINEAR COLLIDERS AND RESULTS PRESENTED DURING THE LAST THREE INTERNATIONAL WORKSHOPS CONTINUE TO SUPPORT EARLIER CONTENTIONS THAT THE MOST FAVORABLE CHOICE OF LINAC FREQUENCY IS IN THE RANGE OF 10 TO 20 GHZ, WITH PARTICULAR INTEREST IN THE UPPER END OF THE BAND. ALTHOUGH CONSIDERABLE INTEREST EXISTS IN 17 GHZ LINEAR COLLIDER CONCEPTS-AND SOME RESEARCH ACTIVITIES ARE ALREADY IN PROGRESS AT BROOKHAVEN NATIONAL LABORATORY AND MASSACHUSETTS INSTITUTE OF TECHNOLOGY (AND IN PRIVATE LABORATORIES INTERESTED IN COMMERCIAL APPLICATIONS OF HIGH FREQUENCY LINACS)-THERE ARE NO RELATIVISTIC KLYSTRONS (RK) PRESENTLY AVAILABLE TO SUPPORT 17 GHZ HIGH GRADIENT ACCELERATOR RESEARCH. (LINEAR COLLIDER RK DEVELOPMENT IS AT 14 GHZ IN RUSSIA AND AT 11.4 GHZ IN THE UNITED STATES AND JAPAN). THE OBJECTIVE OF THIS PROJECT IS TO STUDY MEANS OF COMBINING RESEARCH ON HIGH POWER TRAVELING WAVE RELATIVISTIC KLYSTRON (TWRK) STRUCTURES; LONG RADIO FREQUENCY (RF) PULSE CIRCUIT DEVELOPMENT; AND THE AVAILABILITY OF AN EXISTING 580 KV, 120 A, 1 MUS PULSED-BEAM TEST FACILITY. REACHING THIS OBJECTIVE WILL ALLOW THE ESTABLISHMENT OF AN INEXPENSIVE PROGRAM FOR THE DESIGN, FABRICATION, AND TESTING OF A NEW RF SOURCE SUITABLE FOR HIGH GRADIENT 17 GHZ ACCELERATOR RESEARCH. PHASE I IS EXPLORING THE FEASIBILITY OF EXTENDING TO 17 GHZ NEW DESIGN CONCEPTS ASSOCIATED WITH A RECENTLY DEMONSTRATED 43% CONVERSION EFFICIENCY, 100 MW, 11.4 GHZ RK USING A NOVEL SLOW WAVE OUTPUT STRUCTURE. SPECIAL DESIGN EMPHASIS IS BEING DIRECTED AT ACHIEVING A GAIN OF 60 DB AND AN EFFICIENCY OF >48% WITH A PROTOTYPE 30 MW TUBE. IN PHASE II, THE 17 GHZ TWRK AND ITS HIGH POWER RF DIAGNOSTIC EQUIPMENT WILL BE CONSTRUCTED AND INSTALLED IN THE TEST FACILITY, LONG PULSE HIGH POWER RF TESTS WILL BE PERFORMED, AND THE INTEGRITY AND SUITABILITY OF THE TUBE WILL BE EVALUATED. IT IS EXPECTED THAT THIS LOW PERVEANCE, HIGH EFFICIENCY TWRK COULD BE A STRONG CANDIDATE FOR A LINEAR COLLIDER PULSE COMPRESSION POWER SOURCE.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.