SBIR/STTR Research Award

Self-Erecting, In-Situ Manufactured, Wind Energy Tower, Development of Nacelle Assembly Lifting System

Award identifier 78d1be9ef0bb203c74d3a4e7d0a65b22d4ea08918862b5383007aa7c8f3bed56Awarding agency Department of Energy

Award amount

$749,999

Program and phase

SBIR · Phase II

Award year

2008

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Native American Technologies Company
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
DE-PS02-06ER06-30
Topic code
04

Research abstract

Utility-scale wind turbines are getting so large that transportation limitations are driving final, onsite assembly costs.  To address this problem, this project will design an apparatus for placing wind turbine components ¿ the nacelle, generator, gear box, rotor, and blades ¿ on top of an in-situ-fabricated, self-erecting tower, without using an external crane. The approach builds on UltraTall, the result of a National Renewable Energy Laboratory funded project, in which a self-erecting tower (4 sections, 1:15 reduced scale, 5.3 meter tall) was fabricated and tested. However, it was beyond the scope of that project to develop a nacelle placement apparatus. In Phase I of this project, four different design concepts for the nacelle placement apparatus were prioritized and a detailed design of the leading concept was completed. Phase II will conduct a detailed Finite Element Analysis (FEA) of the nacelle placement system (tower plus nacelle placement apparatus), develop a full scale prototype, and then test the apparatus. The plan is to erect three sections of a full-scale UltraTall tower and use the prototype nacelle placement system to lift an equivalent weight. (The construction of a full-scale wind generating system for testing the nacelle placement system is beyond the scope of Phase II.) The nacelle placement apparatus and tower sections will have a complete set of sensors, and a structural health monitoring system will be used to collect data on the structural behavior. That data will be used to validate the FEA. Commercial Applications and Other Benefits as described by the awardee: The plan for Phase III is to erect and demonstrate a full-scale wind energy system that utilizes the UltraTall tower. The site, which is on a farm in eastern Oklahoma, already has two transmission lines from utilities that have on-going wind-energy programs.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.