SBIR/STTR Research Award

PipeTaz: Automated Pipe Asbestos Insulation Removal and Processing System

Award identifier eeaa39a38ff776fa0eb7d0e027ef2afc4c3b415481d7d1dd18fb17506d58eeabAwarding agency Department of Energy

Award amount

$0

Program and phase

SBIR · Phase I

Award year

2001

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
AUTOMATIKA, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

60104 Asbestos abatement costs, associated with the DOE¿s national weapons¿ complex clean-up efforts, may amount to $300-500 million, while nationally, asbestos abatement may cost more than $100 billion over the next 25 years. Abatement methods have changed little in the past 20 years, and there is a need for a cheaper, faster, and safer abatement method. This project will design, build, test, and commercialize an in-situ asbestos abatement system, called PipeTaz, designed to: (1) reduce the personnel required to abate asbestos, (2) increase the speed at which asbestos insulation can be removed, (3) allow the cleaned pipe to be recycled, and (4) reduce the volume and weight of asbestos. In Phase I, laboratory tests of various concepts for PipeTaz were conducted, design specifications for the system were developed, the functionality of a pre-prototype cutting system was tested, and a hand-held asbestos removal tool was modified. The Phase I effort showed that the conceived PipeTaz abatement approach is feasible and demonstrated optimal cutting and pipe transport technologies. Phase II will: (1) develop a complete and detailed system design; (2) fabricate, assemble, and test the prototype system using simulant-material; (3) develop a Technology Safety Data Sheet, Human Factors Assessment Document, and a regulatory and operational review; and (4) perform pilot-trials with asbestos-containing materials under realistic field conditions. Commercial Applications and Other Benefits as described by the awardee: PipeTaz should be useful for any pipe-asbestos demolition job, and the system could be used by most companies. PipeTaz will (1) reduce pipe-asbestos removal costs, (2) increase abatement productivity, (3) increase abatement safety, (4) reduce waste packaging in handling costs, (5) allow for waste stream separation, (6) allow for waste volume reduction, (7) result in reduced disposal costs, (8) enable the recycling of steel pipe waste, (9) reduce the volume of asbestos waste, and (10) reduce environmental costs/burdens.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.