SBIR/STTR Research Award

REACTOR (LMR) STEAM GENERATOR TUBING-

Award identifier d36328ebaf3e84fcec68e791debbf92830b764a86355a019cb908fdad8711918Awarding agency Department of Energy

Award amount

$49,928

Program and phase

SBIR · Phase I

Award year

1985

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
N D T Technologies Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
XXWHAWLWWCF6
Solicitation number
Not reported
Topic code
Not reported

Research abstract

TO PREVENT THE RELEASE OF RADIONUCLIDES, LIQUID METAL REACTOR (LMR) STEAM GENERATOR TUBING AND THE TUBE-TO- TUBESHEET WELDS HAVE TO FORM A HIGHLY RELIABLE SODIUM- TO-WATER PRESSURE BOUNDARY IN ADDITION TO THEIR FUNCTIONAL PERFORMANCE OF EXTRACTING HEAT FROM THE REACTOR. IN PRESENT COMMERCIAL NUCLEAR POWER PLANTS, FORCED OUTAGES CAUSED BY STEAM GENERATOR TUBE LEAKS HAVE EXCEEDED ALL OTHER CAUSES COMBINED AS A CAUSE OF UNPLANNED DOWNTIME. THEREFORE, AN IN-SERVICE INSPECTION SYSTEM IS NEEDED FOR THE EXAMINATION OF LIQUID METAL REACTOR (LMR) STEAM GENERATOR TUBES AND THE TUBE-TO- TUBESHEET WELDS. THIS PROJECT IS TO DEMONSTRATE A NEW ELECTROMAGNETIC METHOD FOR IN-SERVICE TUBE INSPECTION. TWO DIFFERENT TYPES OF IN-SERVICE INSPECTION ARE ARE POSSIBLE USING THIS NEW METHOD: (1) THE DETECTION AND QUANTITATIVE IDENTIFICATION OF LOSS OF METALLIC CROSS-SECTIONAL AREA (LMA) CAUSED BY CORROSION, THINNING, AND WASTAGE; AND (2) THE DETECTION OF LOCALIZED FLAWS (LF) SUCH AS STRESS CORROSION CRACKING, PITTING, DENTING, AND MECHANICAL DAMAGE. FEASIBILITY WILL BE STUDIED BY BUILDING AND TESTING A PROTOTYPE INSPECTION SYSTEM. IF FEASIBLE, THE PLANNED TECHNIQUE WILL REQUIRE SUBSTANTIALLY LESS INSPECTION TIME THAN CURRENT ULTRASONIC METHODS. FURTHERMORE, COMPARED TO OTHER INSPECTION METHODS, THE NEW TECHNIQUE PROMISES SUBSTANTIALLY IMPROVED SIGNAL-TO-NOISE RATIO, FLAW DETECTABILITY, PENETRATION DEPTH, AND QUANTITATIVE FLAW IDENTIFICATION ACCURACY.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

6 SBIR/STTR records share this UEI (1985–2007). Reported award amounts total $452,783. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.