SBIR/STTR Research Award
A TECHNICAL FEASIBILITY STUDY APPLICABLE TO GENERAL PURPOSE AUTOMATIC PULSE MEASUREMENT
Award amount
$617,000Program and phase
SBIR · Phase IIAward year
1985Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- Systems For Automatic Test
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
PRECISE CHARACTERRIZATION OF THE PULSED RF SIGNAL RESPONSE OF A MODULE IS OFTEN NECESSARY TO ENSURE ITS PERFORMANCE IN A SYSTEM. SOME SYSTEMS REQUIRE THAT MANY MODULES OF A TYPE BE ACCURATELY CHARACTERIZED IN GAIN AND PHASE RESPONSE OVER A RANGE OF FREQUENCY AND SIGNAL LEVELS. A APPROACH TO ACCURATELY MEASURING THESE PARAMETERS USING CURRENTLY AVAILABLE INSTRUMENTS UNDER COMPUTER CONTROL IS DESCRIBED. A TECHNICAL FEASIBILITY STUDY IS PROPOSED THAT WILL LEAD TO DEFINITIVE SYSTEM REQUIREMENTS AND SPECIFICATIONS FOR AN AUTOMATIC PULSE MEASUREMENT SYSTEM (APMS). THE PERFORMANCE CHARACTERISTICS OF SELECTED COMMERCIALLY AVAILABLE INSTRUMENTATION PRODUCTS ARE USED TO HELP ENSURE THE TECHNICAL FEASIBILTY OF THE PROPOSED SYSTEM WITHIN CURRENT STATE-OF-THE-ART LIMITATIONS.
Technology keywords
Not reported