SBIR/STTR Research Award

ENHANCED LOADING CAPACITY AND SERVICE LIFE OF WIRE ROPE CORE MATERIALS BY ION IMPLANTATION

Award identifier 9fd361953fb698574d011568bd6b93eaf751f1f796436403cc91cd9e7f63ec78Awarding agency Department of Defense · Navy

Award amount

$49,859

Program and phase

SBIR · Phase I

Award year

1991

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
Spire Corporation
Proposal award date
Not reported
Contract end date
Not reported
UEI
RG46KJGARZF4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

IN 1979 BATTELLE COLUMBUS LABORATORIES STUDIED ADVANCED WIRE ROPE. HOWEVER, THEIR EXCESSIVE COST NULLIFIED THEIR UTILITY FOR IMPROVED DECK PENDENT AND PURCHASE CABLE RELIABILITY AND LONGER LIFE. ALTERNATIVELY, EXTRA IMPROVED PLOW STEEL (EIP) OFFERS THE BEST COST/TECHNICAL BENEFIT PERFORMANCE. EIP-S MECHANICAL PROPERTIES DEGRADE, HOWEVER, UNDER SEVERAL OPERATING FACTORS. FIRST, THE HIGH-VELOCITY TRANSVERSE IMPACT OF THE ARRESTING HOOK CAUSES NOTCHING BETWEEN WIREELEMENTS WHICH CAN LEAD TO INSTANTANEOUS FAILURE. SECOND, WHEN THE ROPE SLIDES ACROSS THE ARRESTING HOOK, A WHITE AND BRITTLE OUTER LAYER (UNTEMPERED MARTENSITE) IS FORMED BY THE RAPID THERMAL CYCLING ASSOCIATED WITH HOOK ABABRASION AND CAN RESULT IN CRACK FORMATION AND SUBSEQUENT FATIGUE FAILURE. THIRD, ABRASION OF THE DECK PENDENT BY THE ALUMINUM/EPOXY NON-SKID FLIGHT DECK CAN CAUSE NOTCHING AND FAILURE. CONSEQUENTLY, DECK PENDANTS LOSE 81% OF THEIR UNABRADED FATIGUE LIFE. LASTLY, FATIGUE ALSO OCCURS IN THE PURCHASE CABLE FROM REPEATED CYCLING THROUGH BELOW DECK ARRESTING MECHANISMS. THE LIABILITIES ARE LOSS OF AIRCRAFT AND NAVY PERSONNEL. ION IMPLANTATION OFFERS A GERMANE SOLUTION TO THIS CRITICAL CONCERN OF FATIGUE AND FORMATION OF UNTEMPERED MARTENSITE IN EIP. SPIRE-S IMPLANT TECHNOLOGY IS WELL ESTABLISHED IN COMBATTING HIGH AND LOW-CYCLE FATIGUE AND/OR ROLLING CONTACT FATIGUE FAILURE IN BEARING-GRADE AND TOOL STEELS. SPIRE-S RECENT EXPERIENCE INDICATES THE POTENTIAL FOR COMPLETE ELELIMINATION OF THE PROBLEM BY IMPLANTING THE "STINGER" HOOK AND CABLES FOR TOTAL MECHANICAL ENHANCEMENT. IMPLANTS OF B, C, N, SI, Y, CR+MO, CR+N, TI+C, TA+C, AND NB+N, INTEGRATED WITH MATERIALS AND MECHANICAL ANALYSIS, WILL CONSTITUTE THE PHASE I TECHNICAL APPROACH. ION IMPLANTATION

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

429 SBIR/STTR records share this UEI (1983–2014). Reported award amounts total $73,907,551. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation, Department of Energy, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.