SBIR/STTR Research Award

ADVANCED LOW-STRESS BRAZING OF PLASMA-FACING FUSION COMPONENTS WITH HIGH ENERGY ELECTRON BEAMS

Award identifier f4aeab754bb78e8850c3f4582d7e4dffc4c21ee0b8eb7c3f86b893f98f7eb11bAwarding agency Department of Energy

Award amount

$73,994

Program and phase

SBIR · Phase I

Award year

1994

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Science Research Laboratory, Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
MKKPT9RCLJQ1
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THE USE OF HIGH ENERGY (E ~ 2 TO 19 MEV) ELECTRON BEAMS (HEEB) AT HIGH AVERAGE POWER (P ~ 50 KW TO 1 MW) ALLOWS COMPRESSION ANNEALED PYROLYTIC GRAPHITE (CAPG) AND CARBON-CARBON (CC) COMPOSITE COMPONENTS TO BE JOINED TO METALLIC SUBSTRATES WITHOUT THE HIGH RESIDUAL STRESSES THAT ACCOMPANY CONVENTIONAL BRAZING. RELIABLE BRAZING OF CAPG AND CC TO COPPER ALLOYS IS NECESSARY TO FABRICATE PLASMA LIMITERS AND DIVERTERS FOR USE IN A NEXT LARGE FUSION REACTOR. HEEB JOINING UTILIZES DEEP-PENETRATION VOLUMETRIC HEATING TO PREFERENTIALLY MELT A THIN, HIGH-Z BRAZE ALLOY INTERLAYER. THE LOCALIZED POWER DEPOSITION RAISES THE GRAPHITE AND INTERLAYER TEMPERATURES WITHOUT HEATING OF THE METALLIC SUBSTRATE. THE PROCESS ELIMINATES THE SUBSTRATE COOLING STEP AND THE RESIDUAL STRESSES AND BRAZE FAILURES CAUSED BY THERMAL EXPANSION MISMATCH. HEEB BRAZING WITH INDUCTION LINACS IS A HIGH-THROUGHPUT PROCESS, WHICH WILL ALLOW FABRICATION OF A DIVERTER COMPOSED OF HUNDREDS OF THOUSANDS OF TILES AT LOW UNIT COST. A NEW GENERATION OF PULSED INDUCTION LINEAR ACCELERATORS HAS BEEN DEVELOPED WHICH ALLOW RELIABLE, COST EFFICIENT PRODUCTION OF HIGH AVERAGE POWER ELECTRON BEAMS WITH THE NECESSARY PARAMETERS FOR CARBON BRAZING. A UNIQUE FEATURE OF THESE ACCELERATORS IS THE HIGH REPETITION RATE (>5000 PPS) ALL-SOLID-STATE PULSED POWER DRIVERS WHICH MAKE THESE ACCELERATORS SCALABLE TO MW POWER LEVELS AT AN ELECTRON MEAM COST OF $2 TO 3/WATT. THE INDUCTION ACCELERATOR TECHNOLOGY IS CONSISTENT WITH THE POWER DENSITIES (1 TO 5 KW/CM(2) ) AND BEAM ENERGIES (2 TO 10 MEV) REQUIRED FOR LOW-STRESS BRAZING. PRELIMINARY EXPERIMENTS IN PHASE I WILL DEMONSTRATE LOW-STRESS JOINING AND DETERMINE JOINT PROPERTIES. PROCESS OPTIMIZATION AND THE FABRICATION OF GRAPHITE AND CC FIRST-WALL LIMITER PROTOTYPES ARE PLANNED FOR PHASE II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

228 SBIR/STTR records share this UEI (1984–2020). Reported award amounts total $66,288,679. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, Department of Health and Human Services, National Aeronautics and Space Administration, Department of Transportation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.