SBIR/STTR Research Award

MICROCOMPUTER BASED CONTROL OF A LARGE CRYOGENIC WIND TUNNEL

Award identifier 97e7ab15569b9f16065c8f35b2dcd7c499a54c786319df0e9497bd2a0260a984Awarding agency National Aeronautics and Space Administration

Award amount

$448,410

Program and phase

SBIR · Phase II

Award year

1990

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
VIGYAN INC
Proposal award date
Not reported
Contract end date
Not reported
UEI
FJM8WZ8EF8K6
Solicitation number
Not reported
Topic code
Not reported

Research abstract

PROOF OF CONCEPT DEMONSTRATION, OF THE 0.3 M TRANSONIC CRYOGENIC WIND TUNNEL IN EARLY 1970'S, HAS PAVED WAY FOR LARGE HIGH REYNOLDS NUMBER CRYOGENIC TUNNEL LIKE THE NATIONAL TRANSONIC FACILITY (NTF) IN 1984. THE QUALITY OF DATA GENERATED IN A CRYOGENIC TUNNEL IS INTIMATELY RELATED TO THE STABILITY OF THE TUNNEL TEST SECTION FLOW STATES VIZ,STAGNATION PRESSURE, TUNNEL GAS TEMPERATURE AND FLOW MACH NUMBER. THE TUNNEL FLOW STATE DYNAMICS IS HIGHLY NONLINEAR AND COUPLED RELATIVE TO THE INPUTS USED FOR CONTROLLING THE TUNNEL. THE 0.3 M TRANSONIC CRYOGENIC TUNNEL AT LANGLEY RESEARCH CENTER HAS BEEN OPERATIONAL FOR NEARLY 14 YEARS OF WHICH IT HAS BEEN UNDER CLOSE LOOP CONTROL FOR EIGHT YEARS. RECENTLY THE 0.3 M TCT HAS BEEN BROUGHT UNDER FULL CONTROL OF A 16 BIT MICROCOMPUTER TO REALIZE TEMPERATURE STABILITY OF +/-0.15 K, REYNOLDS NUMBER TO +/-0.03 MILLION AND MACH NUMBER TO +/-0.002. THE CONTROL ANALYSIS USED HAS BEEN A LUMPED PARAMETER APPROACH AND MECHANIZATION OF THE CONTROL LAW IS THROUGH USE OF STANDARD COMMERCIAL MICROCOMPUTER HARDWARE WITH FLEXIBLE SOFTWARE WRITTEN IN A HIGH LEVEL REAL TIME LANGUAGE. THE AIM OF THIS PROPOSAL IS TO APPLY LUMPED PARAMETER CONTROL TECHNIQUES, AND MICROCOMPUTER SOFTWARE BASED MECHANIZATION OF CONTROL LAWS TO THE NATIONAL TRANSONIC FACILITY. SPECIFICALLY, DEMONSTRATION OFTEMPERATURE IS PROPOSED.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

38 SBIR/STTR records share this UEI (1984–2019). Reported award amounts total $5,404,902. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense, Department of Energy

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.