SBIR/STTR Research Award
THE OBJECTIVE OF PHASE I IS TO ESTABLISH THE FEASIBILITY OF A CONCEPT TO DESIGN AND BUILD A SPECIAL PURPOSE MACHINE THAT WILL HAVE THE CAPABILITY OF FILLING AND SECURELY CLOSING AT LEAST 600 SANDBAGS PER HOUR.
Award amount
$49,810Program and phase
SBIR · Phase IAward year
1984Award details
- Awarding agency
- Department of Defense
- Branch
- Navy
- Recipient company
- University Resrch. Engrs. &
- Proposal award date
- Not reported
- Contract end date
- Not reported
- UEI
- Not reported
- Solicitation number
- Not reported
- Topic code
- Not reported
Research abstract
THE OBJECTIVE OF PHASE I IS TO ESTABLISH THE FEASIBILITY OF A CONCEPT TO DESIGN AND BUILD A SPECIAL PURPOSE MACHINE THAT WILL HAVE THE CAPABILITY OF FILLING AND SECURELY CLOSING AT LEAST 600 SANDBAGS PER HOUR. THE MACHINE WILL BE MOTOR OPERATED, OPERABLE BY ONE PERSON IN A COMBAT ENVIRONMENT AND TRANSPORTED BY A TACTICAL VEHICLE. THE BENEFITS FROM SUCH A DEVICE WOULD INDIRECTLY BE THE PROTECTION OF PERSONNEL AND EQUIPMENT IN A COMBAT ENVIRONMENT. THE CONSTRUCTION SPEED WHEN BUILDING FIELD FORTIFICATIONS, PERSONNEL SHELTERS, AMMUNITION BUNKERS AND GUN EMPLACEMENTS, IS EXTREMELY IMPORTANT. THE PHASE I EFFORT WILL ENTAIL A CAREFUL EVALUATION OF THE OPERATING ENVIRONMENT, POTENTIAL CONTENT VARIATIONS OF THE ON-SITE MATERIAL, ETC., PRIOR TO DEVELOPING A DETAILED SET OF DESIGN SPECIFICATIONS AND OPERATING REQUIREMENTS. THE PRELIMINARY DESIGN CONCEPT IS COMPARED TO THE SPECIFICATION, AND THE STATE-OFTHE-ART IN SOIL HANDLING TECHNOLOGY. A DESIGN RISK AND FIELD RELIABILITY ASSESSMENT IS MADE AS A PART OF THE SYSTEM EVALUATION. AN ENGINEERING MODEL COULD BE MADE TO DEMONSTRATE CRITICAL SUBASSEMBLIES BEFORE ADVANCING TO PHASE II. THE POSSIBLE COMMERCIAL APPLICATIONS ARE SIGNIFICANT; ESPECIALLY IN THOSE GEOGRAPHIC REGIONS THAT ARE SUBJECTED TO SEASONAL FLOOD CONTROL PROBLEMS.
Technology keywords
Not reported