SBIR/STTR Research Award

Identification and Analysis of Problem Fastened Joints on the F-15

Award identifier 8b123bfd9302442f460b187d3228b572717ed3576518f4ee2c94a892cf373b36Awarding agency Department of Defense · Air Force

Award amount

$49,964

Program and phase

SBIR · Phase I

Award year

1993

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
Electroimpact, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
GKZLEMB7K1D6
Solicitation number
Not reported
Topic code
Not reported

Research abstract

Fasteners are used extensively on both military and civilian aircraft structures. Stress concentrations introduced by fastener holes, the intimate contact between these materials dissimilar in nature and/or stiffness and the inherent load transfer demands placed on the fasteners themselves can all lead to problems in service. One of the critical parameters which determines the longevity of a joint's integrity is the preload with which the parts are fastened. A tight joint insures tht the two parts move as one under subjected flight loads and vibrations. Fighter aircraft are particularly susceptible to problems due to the extreme flight, vibration and environmental load conditions experienced in service. Loss of preload initially results in fretting of the joint. This leads to wear of the fastener and/or the substrate material and if undetected to crack initiation and ultimate material failure. The USAF F-15 fighter will be chosen as a typical fighter aircraft for this investigation. With the assistance of McDonnell Douglas Aircraft (MDA), information will be gathered from the F-15 Depot Maintenance organization to identify which locations on service aircraft have experienced grip-loss problems in fastened components. For each problem area, the specific parameters defining the geometry and materials will be determined. Once this data collection is complete, a typical problem area will be selected for the Phase I case study. A selection criteria process will be used to determine which problem area is best suited for more detailed analysis and testing. In the Phase I case study, the service environment of the target area on the F-15 will be estimated from MDA's extensive F-15 database. An empirical case study will be performed to gain a more thorough understanding of the physical phenomenon which causes the fastened joints to lose their preload. Twenty four representative test specimens will be assembled per the existing installation specifications. These specimen will be tested under flight load, vibrational and harsh environmental conditions. Nut torque, joint preload and microstructual analysis will be performed at various time intervals during these te

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

9 SBIR/STTR records share this UEI (1987–1993). Reported award amounts total $1,491,394. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Science Foundation, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.