SBIR/STTR Research Award

THE PURPOSE OF THE PROPOSED PROJECT IS TO TEST THE FEASIBILITY OF ADAPTING A MANUALLY-OPERATED TRASH COMPACTOR DESIGNED BY JOHNSON ENGINEERING CORPORATION (JE) FOR USE ON SPACE STATION.

Award identifier eea9d7674c11ec3d33081b1b92ce9482344d5a7f28ea780b1183a45ad19c2b46Awarding agency National Aeronautics and Space Administration

Award amount

$49,993

Program and phase

SBIR · Phase I

Award year

1985

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
Johnson Engineering
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THE PURPOSE OF THE PROPOSED PROJECT IS TO TEST THE FEASIBILITY OF ADAPTING A MANUALLY-OPERATED TRASH COMPACTOR DESIGNED BY JOHNSON ENGINEERING CORPORATION (JE) FOR USE ON SPACE STATION. DISPOSAL OF SOLID TRASH PRESENTS A PROBLEM ON BOARD ALL SPACECRAFT. THIS PROBLEM INCREASES IN PROPORTION TO CREW SIZE AND MISSION DURATION. SPACE STATIONPLANNING REQUIRES THAT THIS TRASH BE COMPACTED AND STORED FOR RETURN TO EARTH ON BOARD PERIODIC SUPPLY CRAFT. SINCE THE TRASH WILL INCLUDE FOOD SCRAPS AND LEFTOVERS, PROVISIONSFOR DEODORIZING, BACTERIA CONTROL, AND LIQUID CONTAINMENT ARE REQUIRED. A SYSTEM STUDY IS PROPOSED TO DETERMINE DESIGN REQUIREMENTS, CONDUCT DESIGN ANALYSES, TRADE STUDIES,AND TESTING. AN EXISTING WORKING PROTOTYPE DESIGH PATENTED BY JOHNSON ENGINEERING AND DERIVED FROM SPACE SHUTTLE HABITABILITY STUDIES WILL BE USED AS A TEST BED TO GATHER DESIGN DATA. MANUAL OPERATION OFFERS MAJOR ADVANTAGES: (1) OPERATING POWER IS NOT REQUIRED; (2) WEIGHT SAVINGS RESULT FROM ELIMINATION OF HEAVY ELECTRIC MOTORS; AND (3) PERIODIC OPERATION OF THE MANUAL SYSTEM PROVIDES BENEFICIAL EXERCISE FOR ASTRONAUTS. A PHASE I FINAL PROJECT REPORT WILL BE PREPARED SUMMARIZING STUDY AND TEST RESULTS, DOCUMENTING THESELECTED DESIGN AND RECOMMENDING WORK TO BE UNDERTAKEN IN PHASE II.

Technology keywords

Not reported

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.