SBIR/STTR Research Award

INDIUM GALLIUM ARSENIDE THERMOPHOTOVOLTAIC ENERGY CONVERTERS

Award identifier be7edc98343f66238245055e1be6a5848fef134e2d95a3552765944255642e62Awarding agency Department of Energy

Award amount

$67,820

Program and phase

SBIR · Phase I

Award year

1993

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Spire Corporation
Proposal award date
Not reported
Contract end date
Not reported
UEI
RG46KJGARZF4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THERMOPHOTOVOLTAIC INDIUM GALLIUM ARSENIDE (INGAAS) CELLS ARE PROPOSED FOR CONVERGING ENERGY FROM A RADIOISOTOPE POWER SOURCE, THE GENERAL PURPOSE HEAT SOURCE (GPHS), INTO ELECTRICITY WITHCONVERSION EFFICIENCIES CONSIDERABLY HIGHER THAN THOSE OBTAINED WITH THERMOELECTRIC GENERATION. IN GAAS IS A TERNARY SEMICONDUCTOR ALLOY WHOSE BANDGAP CAN BE VARIED FROM 0.36 EV TO 1.42 EV. THE 0.74EV IN0.53GA0.47 AS COMPOSITION IS PARTICULARY USEFUL SINCE HIGH QUALITY IN GAAS CAN BE GROWN LATTICE-MATCHED TO INDIUM PHOSPHIDE (INP) WAFERS,RESULTING IN GOOD P-N JUNCTIONS AND HIGH CONVERTER EFFICIENCY. THIS 0.74 EV BANDGAP IS TO HIGH FOR EFFICIENT THERMOPHOTOVOLTAIC CONVERSION WITH THE 1100 DEGREE CENTIGRADE GPHS. A BANDGAP OF 0.5 EV WOULD DELIVER TWICE THE POWER IF IT WERE NOT FOR DEFECTS CREATED WHEN INGAAS IS GROWN MISMATCHED. ANOPTIMIZATIO STUDY OF THIS TRADEOFF BETWEEN CELL DEGRADATION DUE TO MISMATCH AND THE INCREASED OUTPUT POWER POSSIBLE BY MATCHING THE CELL BANDGAP TO THE GPHS RADIATION SPECTRUM IS PLANNED INTHIS PROJECT. PHASE I WILL GROW INGAAS WITH BANDGAPS OF 0.74, 0.70, 0.65, 0.55, AND 0.50 EV, FABRICATE CELLS, AND TEST THEM TO DETERMINE THE RELATIVE DEGRADATION OF THE CELLS AS THE INGAASCOMPOSITION IS MOVED AWAY FROM AN EXACT LATTICE-MATCH TO INP. IN PHASE II, THE PHASE I CELL THAT DELIVERED THE HIGHEST OUTPUT POWER UNDER THE GPHS RADIATION WILL BE EXPERIMENTALLY DEVELOPED INTO A PROTOTYPE POWER CONVERTER. IN PHASE III, A CONVERTER WILL BE DEVELOPED FOR A SPECIFIC MISSION.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

429 SBIR/STTR records share this UEI (1983–2014). Reported award amounts total $73,907,551. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, National Science Foundation, Department of Energy, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.