SBIR/STTR Research Award

Multiple Concentric High Voltage Cable

Award identifier e1c988b17f5900b20751f569a493748948444115bd22fd9bdd9c505cf2275223Awarding agency Department of Energy

Award amount

$99,651

Program and phase

SBIR · Phase I

Award year

2002

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
DIVERSIFIED TECHNOLOGIES, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
ZNG4WKWT2YM4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

70736 The Next Generation Linear Collider (NLC) requires significant numbers of klystrons and pulsed power supplies for operation. The baseline klystron design requires pulsing at 500 kV, which leads to significant losses in the pulsed power supplies, representing $40 ¿ $100 million or more in electricity costs over a 10 year NLC life. A gridded sheetbeam klystron that eliminates the 500 kV pulsing and associated power losses is being developed as an alternative to this baseline klystron. However, the new klystron will require a fundamentally new approach to powering the sheetbeam klystrons, one that places significant demands on the two hundred foot cable that is envisioned to connect the power supplies and fast grid pulsers to the klystrons. This project will develop high voltage cables that will meet the NLC sheetbeam klystron requirements and be affordable in the large quantities required for construction of the NLC itself. Phase I will perform the required analyses and tradeoffs of the cable and connector design, materials, construction methods, and performance to arrive at one or more manufacturable cable designs. One or more complete, manufacturable cable designs will be constructed and tested in Phase II. Commercial Applications and Other Benefits as described by the awardee: The new cable should contribute to a large reduction in the operational costs of the Next Generation Linear Collider. At the same time, this design would enable a more cost-effective physical configuration of the NLC power system, which would reduce construction and maintenance costs. Beyond the NLC, thousands of industrial and medical accelerators could benefit from adopting the sheetbeam klystron, which would utilize the new cable technology.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

166 SBIR/STTR records share this UEI (1989–2025). Reported award amounts total $65,542,650. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, Department of Agriculture, Environmental Protection Agency, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.