SBIR/STTR Research Award

A CONTINUOUS CRYOPUMP/PELLET-FABRICATION APPARATUS FOR FUSION

Award identifier 37a5b64303448304ba2f5521fdd19071691e337918d8ba5911985f872eb4da6aAwarding agency Department of Energy

Award amount

$748,826

Program and phase

SBIR · Phase II

Award year

1995

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Cryogenic Applications F, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
Not reported
Solicitation number
Not reported
Topic code
Not reported

Research abstract

FUSION REACTORS BASED ON THE MAGNETIC CONFINEMENT OF PLASMAS WILL REQUIRE ACTIVE FUELING TO REPLENISH THE DEUTERIUM/TRITIUM ESCAPING THE PLASMA. CRYOGENIC PUMPS AND FROZEN PELLET INJECTION ARE THE MOST EFFICIENT MEANS OF PUMPING AND REFUELING THE TOKAMAK PLASMA. SINCE THE BURN RATE OF THE REACTOR IS ONLY A FEW PERCENT, HOWEVER, THE EXHAUST FUEL WILL HAVE LARGE QUANTITIES OF UNREACTED DEUTERIUM AND TRITIUM. SINCE TRITIUM IS A RADIOACTIVE GAS IT IS IMPORTANT TO LIMIT THE TOTAL TRITIUM INVENTORY OF THE REACTOR TO A MINIMUM. THIS WILL REQUIRE RAPID RECYCLING OF THE TRITIUM PUMPED FROM THE REACTOR INTO THE PELLET FUEL INJECTION SYSTEM. THIS PROJECT WILL ACCOMPLISH THIS WITH A CONTINUOUS CRYOGENIC FOREPUMP WHICH WILL RECEIVE THE EXHAUST FROM THE PRIMARY PUMPING SYSTEM AND PRODUCE HIGH QUALITY FROZEN DEUTERIUM/TRITIUM PELLETS SUITABLE FOR DIRECTLY FEEDING A CENTRIFUGE PELLET INJECTOR. THE CRYOPUMP WILL THUS BE ABLE TO GREATLY REDUCE THE TRITIUM INVENTORY BY RECYCLING THE FUEL BACK INTO THE PLASMA WITHIN A FEW MINUTES FROM THE TIME THE FUEL ENTERS THE PUMP. IN ADDITION THE PROPOSED PUMP/PELLET FABRICATION APPARATUS CONSISTS OF A SINGLE CRYOPANEL WHICH WILL BOTH PUMP AND PRODUCE PELLETS WITH NO MOVING PARTS, THEREBY GREATLY INCREASING THE RELIABILITY AND REDUCING THE COST OF THE APPARATUS AS COMPARED TO CONVENTIONAL PUMPING AND PELLET FUELING SYSTEMS. IN PHASE I A SMALL PUMP WILL BE CONSTRUCTED WHICH WILL DEMONSTRATE THE CAPABILITY OF PRODUCING DEUTERIUM PELLETS, AND A CONCEPTUAL DESIGN OF A FULL SCALE REACTOR SYSTEM, TO BE CONSTRUCTED AND TESTED AS A PHASE II EFFORT, WILL BE PRODUCED.

Technology keywords

Not reported

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.