SBIR/STTR Research Award

Medium Voltage Direct Current Disconnect Switches

Award identifier 6f9e09982898649c499de77b14019affe5938590b9ba1f7ae57c905f0be8fd41Awarding agency Department of Defense · Navy

Award amount

$1,375,080

Program and phase

SBIR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
DIVERSIFIED TECHNOLOGIES, INC.
Proposal award date
2024-09-04
Contract end date
2026-08-20
UEI
ZNG4WKWT2YM4
Solicitation number
22.1
Topic code
N221-064

Research abstract

Future U.S. Navy DC power distribution systems will require advanced switchgear technology to enable the reductions in volume, weight, cost, and maintenance possible with high-speed DC shipboard power distribution and protection systems. Disconnect switches are isolation devices which serve a critical role in the power system architecture, configuring buswork and associated equipment while safely isolating unpowered equipment. Under the SBIR Phase I effort, Diversified Technologies, Inc. (DTI) documented the Navy requirements, evaluated disconnect switch operational components in a trade study, and fabricated hardware. Based upon the trade study, a scalable, 100 – 4000 Ampere, two-pole, 12 kV disconnect switch design was selected and developed. A brassboard device was designed and built, demonstrating operation at 2000 A. The disconnect switch showed expected opening and closing performance. Voltage standoff was demonstrated at twice the rated voltage. The contact resistance was tested and measured, yielding an efficiency >99.99%. In addition, DTI developed conceptual models of modular switchgear cabinets capable of containing many internal disconnect switches for high power density configuration of multiple buses, power sources, and loads. MVDC disconnect switch feasibility and practicality were demonstrated by analysis, hardware fabrication, and testing in the Phase I Base effort. In the Phase II effort, DTI proposes to develop a family of air-cooled, high efficiency, high power density MVDC two-pole disconnect switches and accompanying cabinet enclosures for 12 kV MVDC distribution systems. These devices can be used in LVDC systems. DTI will complete the design for a family of full-featured high performance two-pole disconnect switches, and will build and test a 12 kV, 2 kA advanced Prototype with improved performance and network capabilities. In the Phase II Option 1 effort, DTI will continue testing the Prototype to include remote operation and finalize the design of the switchgear enclosure. In the Phase II Option 2 effort, DTI will build the switchgear enclosure, and deliver and install the switchgear enclosure with multiple Prototype disconnect switches in a Navy facility.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

166 SBIR/STTR records share this UEI (1989–2025). Reported award amounts total $65,542,650. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, Department of Agriculture, Environmental Protection Agency, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.