SBIR/STTR Research Award

Compact Modular Telemetry System for Wind Tunnel Test Data

Award identifier ecb343be9718bb3df5f88ac720741d9d74f2e33026138d80970e6079ca92455cAwarding agency Department of Defense · Air Force

Award amount

$1,249,909

Program and phase

SBIR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
CMA TECHNOLOGIES, INC.
Proposal award date
2024-07-30
Contract end date
2026-06-02
UEI
HEK5HE5EGXL3
Solicitation number
23.1
Topic code
AF231-0009

Research abstract

The CMTS is an air gapped telemetry system specifically designed for wind tunnel testing.  The wind tunnel application presents a number of factors that are almost diametrically opposite those experienced in conventional telemetry design.  The environment through which the radio frequency (RF) link must pass is bounded by metallic walls that are highly reflective with a very short pathlength requiring unusual treatment to ensure transmission integrity.  The required throughput of up 50 channels at a10 kHz rate, is consistent with modern telemetry capabilities.  The environmental conditions encountered over the range of testing performed at the Arnold Engineering Development Complex (AEDC) present other unique challenges.  For example, at Mach 10 the freestream temperature in the tunnel is only a few degrees above the liquefaction point.  Surfaces in contact with the airstream are heated to many hundred degrees.  The aerodynamic heat conducts into the model raising the internal temperature of the telemetry electronics.  CMTS includes an environmental control system and has the capability to include active cooling via gas or liquid heat exchange. In proposing the Phase I effort, the RF link was the most significant challenge for the system.  CMA built an electromagnetically similar surrogate tunnel having the dimensions of the AEDC VKF-A wind tunnel.  An extensive test program characterized RF transmission in the tunnel environment in both the L and S band frequency ranges.  Testing included all common modulation formats including continuous wave (CW), amplitude modulation (AM), frequency modulation (FM), phase modulation (PM), and shaped offset quadrature phase shift keying modulation (SOQPSK).  CMA successfully demonstrated an end-to-end, bidirectional telemetry link using Range Commanders Council (RCC), Interrange Instrumentation Group (IRIG) approved, SOQPSK telemetry system. The proposed Phase II program builds upon the information gained in the Phase I program, particularly with regard to antenna configuration, antenna matching, and issues in the highly reflective RF environment (including self-modulation, cross modulation, multipath transmission, and carrier phase offset).  The program leverages the use of existing, IRIG approved telemetry technology and equipment where possible, significantly reducing risk.   CMTS is modular by design.  Multiple conceptual designs are prepared including a plate configuration (for inclusion inside models or inside an afterbody), a cylinder configuration (for sustained hypersonic testing), a tray model (a combination of the plate and cylinder arrangements), and a stationary configuration (for mounting on or below the sting). The proposed program is accomplished in 19 months.  A prototype system is built in the plate configuration.   The prototype is demonstrated in the AEDC facility, including integration of the telemetry system with the AEDC data system.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

7 SBIR/STTR records share this UEI (2014–2024). Reported award amounts total $3,481,878. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.