SBIR/STTR Research Award

Test System for Underground Pumped Hydro

Award identifier d4fc778c53565fcbc3cbb026bf44d7f5854474ff9a38fb7432f113a7f09a24cbAwarding agency Department of Energy

Award amount

$199,649

Program and phase

SBIR · Phase I

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
GRAVITY POWER, LLC
Proposal award date
2024-07-22
Contract end date
2025-06-21
UEI
W422LGMTWBM9
Solicitation number
DE-FOA-0003202
Topic code
C58-19c

Research abstract

Almost 90% of the stationary electricity storage in the U.S. is pumped hydro, and a huge quantity of additional storage is required, but environmental and social constraints make it impossible for additional pumped hydro, in its current form, to be constructed fast enough to meet demand. Addressing the Problem: Gravity Power Inc. (GPI) is developing a large-scale electricity storage system, the ôGravity Power Plantö (GPP), which builds on the legacy of pumped hydro by using the same power equipment but replaces enormous surface reservoirs with an underground shaft and a hydraulically lifted mass. Land requirements drop from thousands of acres for conventional pumped hydro to less and ten acres for a GPP of similar capacity. Phase I: During Phase 1, GPI will (1) analyze the commercial potential of GPPs; (2) quantify the improvement provided by GPPs relative to existing storage technologies; (3) specify where and how GPPs can be deployed; (4) provide detailed schematics and descriptions of GPP features and operating states; (5) develop the detailed design of a GPP seal assembly at sufficient scale to validate performance in an environment closely approximating that of a commercial-scale GPP; and (6) develop the detailed design of an installation to test the operation and performance of key components of the GPP, with a particular focus on the hydraulic seals. This test facility will use a piston massing more than 100 tonnes and hydropower equipment to stress the seals in an environment closely approximating a commercial-scale GPP, including pressure, piston speed, and piston surface characteristics. Commercial Applications and Other Benefits: Phase II will use the designs created in Phase I to fabricate and test a seal assembly, resulting in a TRL 6 design ready for implementation in commercial-scale GPPs. Such GPPs will allow pumped hydro plants to be constructed almost anywhere high-capacity electricity storage is needed. They will transcend the limitations of PSH, surpass the Long Duration Storage Shot LCoS goal of 5¢/kWh before 2030, and radically reduce project development time and environmental impact.

Technology keywords

Not reported

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.