SBIR/STTR Research Award

C-Tower: A scalable, deployable/retractable, and mobile truss mast to commission relocatable 50-kW class vertical solar arrays on the lunar surface

Award identifier c0357a2453a18c2c163f368db889c8d27b4975c4106299c2d7d82c38c8a50eebAwarding agency National Aeronautics and Space Administration

Award amount

$898,751

Program and phase

SBIR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
CERES ROBOTICS, INC.
Proposal award date
2024-07-19
Contract end date
2026-07-18
UEI
F8ARE9DV2AP5
Solicitation number
SBIR_23_P2
Topic code
H5

Research abstract

Ceres C-Tower is a self-contained novel solution which includes a central mast deployed 23.5m high to commission gt; 60kW solar arrays near lunar poles. It is capable of multiple deployment and retraction cycles, relocation, and remote operations with a long system life of at least 10 years. It has a Specific Mass gt; 85 W/kg amp; Specific Packing Volume gt; 22 kW/m3.nbsp;C-Tower is adaptable to multiple launch vehicles, mission architectures, and landers. The mechanisms are robust under lunar dust and thermal environments. Key structural and mechanical innovations include: Central mast with innovative bearing assembly and unique internal cable-rigging to enable low-mass, high reliability multiple deployment, locking (without need of physical locks), and retraction under lunar gravity, dust, and extreme temperature environment. It is scalable to 50 m. Innovative Solar Array Deployment Arms allows for independent deployment of all solar arrays providing fault tolerance against multiple solar array deployment failures. Leg Mechanism provides stability and leveling with innovative footpad hinge design to minimizes stowed volume. Sun-Tracking Mechanism ensures optimal power generation. During Phase I, Ceres baseline technically feasible C-Tower by performing (i) multiple system amp; component level trade studies, (ii) design space analysis to determine a feasible design boundary to meet the technical goals, amp; (iii) baseline design and verification using finite element analysis of the C-Tower mechanical systems. nbsp; For Phase II, Ceres will perform detailed design, finite element analysis, and simulations for the four C-Tower mechanisms and the integrated structure which will include analysis for lunar surface thermal cycling. Ceres will perform multiple sub-scale and scale prototype tests and simulations under relevant environments, including testing of the full scale central mast prototype under lunar gravity environment (1/6 g) which will mature the structures and mechanisms to TRL 5.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

2 SBIR/STTR records share this UEI (2023–2024). Reported award amounts total $1,041,606. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: National Aeronautics and Space Administration

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.