Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- NOBEL WORKS CORP
- Proposal award date
- 2024-02-01
- Contract end date
- 2025-10-01
- UEI
- C16EV4AGMK26
- Solicitation number
- 22.1
- Topic code
- AF221-0023
Research abstract
Ignition devices for defense applications are often one-shot pyrotechnic safety devices. Reusable scramjet or ramjet systems instead require indefinite reliable ignition cycles. Storage of hypergolic or non-standard resources is an option, yet long-term storage, replenishment, and complexity must be weighed against the relative simplicity and elegance of using existing on-board resources, such as bleed air and conventional aerospace fuels. Beyond reliable ignition across a range of environments, there also exists a need during off-nominal conditions to deposit additional energy into the flame-holding cavity or elsewhere in the combustor to maintain combustion in a supersonic scramjet flow. An appealing advantage would be devices capable of both ignition and sustaining energy deposition to support combustion. Numerous ignition device types have been studied and tested in supersonic flow conditions. The environmental requirements are severe for these applications and further exasperated in reusable systems. This drives the solution towards non-protruding mechanisms that can survive for extended periods. This proposal addresses pulsed detonators (PD) for ignition, with dual-use application in a pulsed setting for quasi-sustained energy deposition. The PD device is chosen for its ability to effectively deposit substantial energy deposition into a flame-holder cavity or combustor versus conventional low-energy passive ignition systems. A challenge is that on-board resources of air and JP or RP-type fuels have large detonation cell widths compared to pure oxygen/JP or air/hydrogen combinations. The detonation cell size substantially drives a PD igniter's overall diameters and lengths. In response, this project transforms available on-board resources to reduce the detonation cell width to minimize the total volume of the PD igniter device. In the Phase I effort, a robust design of experiments with a testbed PD system validated the concept's ability to reduce detonation cell size and thus overall system volume. After successfully demonstrating the feasibility and potential of the innovative solution, the Phase II effort will further develop and refine the technology to meet customer and end-user requirements. The continuation will advance the product from TRL-3, through System Requirement Reviews and Preliminary Design Reviews with the customer and prime-Contractor, producing proof of design units for functional and environmental testing. Phase II culminates with unit deliveries to the customer for testing in relevant scramjet environments, advancing the product to TRL-6.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
2 SBIR/STTR records share this UEI (2023–2024). Reported award amounts total $897,433. Reported amounts are not federal obligations.
Phases: Phase II, Phase I
Agencies: Department of Defense
Agency intelligence
Department of Defense
Back to SBIR/STTR Research Awards