SBIR/STTR Research Award

Pre-Compression Kolsky Bar Tension System for Brittle Material Testing

Award identifier dc929b19b483b5beac83147fcf9b8ffbf43237e82dfc13914a4bfe732a4725c1Awarding agency Department of Defense · Army

Award amount

$1,129,174

Program and phase

STTR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
DYNAMIC SYSTEMS & RESEARCH CORP
Proposal award date
2024-01-29
Contract end date
2026-01-29
UEI
NH84LRZ5NQW1
Solicitation number
22.B
Topic code
A22B-T022

Research abstract

The objective of this effort is to develop a tensile Kolsky bar technique capable of being utilized to measure the response of brittle materials, such as rocks and concretes, in a state of uniaxial dynamic stress and strain-rate equilibrium.  Due to the low-tensile-strength and strain-to-failure behavior of these materials, it is difficult to achieve dynamic stress and strain-rate equilibrium in a traditional Kolsky tensile test before specimen failure is achieved.  Since these physical metrics have not been achieved during testing, the validity of the experimental data is therefore questioned.  Specifically, the state-of-stress and the strain-rate at failure metrics are difficult to determine in a traditional tensile Kolsky set-up.  To address this challenge, the technique developed in the Phase I effort and to be manufactured in this proposed Phase II effort will apply an elastic axial compressive pre-load to the test specimen before a dynamic load is applied through a modified tensile Kolsky bar system.  During the initial tensile loading of the test specimen from the incident bar, the pre-compressive load on the specimen will be negated while allowing the loading pulse and strain rate to equilibrate load at lower mean values and therefore earlier into the experiment.  The design allows the preload to be adjustable to account for different material types and can be applied at a sufficiently low-level to restrict the test specimen from being plastically damaged before the dynamic tensile load is applied.   Finally, novel pulse-shaping and specimen grip designs were developed and demonstrated in the Phase I effort to address potential risk features of this technique.  During the proposed Phase II effort, DSR/SMU staff shall complete the development, manufacturing, installation, and training of US Army personnel with this pre-compression tensile Kolsky bar system. Pulse-shaping enhancements from Phase I testing will also be completed along with any modifications to the specimen grip designs developed and demonstrated in this Phase I effort.  The proposed 24-month effort will consist of a 12–16-month manufacturing phase followed by 8-12 months of installation certification and testing support.  It is expected that the results from initial testing of concretes in this device will aide in hardened structures constitutive modelling efforts for shock environments from penetration and blast events for systems such as hyper-sonic missiles.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

11 SBIR/STTR records share this UEI (2009–2024). Reported award amounts total $4,817,412. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.