Lighter Faster Deployable Assault Gap Crossing System with ADI
Award amount
$239,842Program and phase
SBIR · Phase IAward year
2024Award details
- Awarding agency
- Department of Defense
- Branch
- Navy
- Recipient company
- SKULD LLC
- Proposal award date
- 2023-11-08
- Contract end date
- 2025-03-06
- UEI
- J5JKZW5JS5N7
- Solicitation number
- 23.2
- Topic code
- N232-079
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Lighter Faster Deployable Assault Gap Crossing System
- Low Cost Additive Casting System for Aerospace Grade Aluminum
- Evaporative Casting for Aluminum Plug Tube Fitting
- Reducing The Weight of Vehicle Components Via Lost Foam Casting of Ductile and Austempered Ductile Iron
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Mobile Lightweight Folding/Expandable (LIFE) Bridge
- Mobile Lightweight Folding/Expandable (LIFE) Bridge
- Rapidly Assembled Portable Tactical Operations Ramp (RAPTOR)
Research funding history
5 SBIR/STTR records share this UEI (2019–2025). Reported award amounts total $2,789,836. Reported amounts are not federal obligations.
Phases: Phase I, Phase II – Direct to Phase II, Phase II
Agencies: Department of Defense, Department of Energy