SBIR/STTR Research Award

Runaway Electron Mitigation Coil Self Activating Switch

Award identifier 1c531623acd44e94b32540cba38bc0cec250c85e0b4a8ae64014358708de7a80Awarding agency Department of Energy

Award amount

$1,099,829

Program and phase

SBIR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
DIVERSIFIED TECHNOLOGIES, INC.
Proposal award date
2023-08-21
Contract end date
2025-08-20
UEI
ZNG4WKWT2YM4
Solicitation number
Not reported
Topic code
C54-28c

Research abstract

In advanced fusion machines, high current beams (megamps) of relativistic electrons (10s of MeV) can cause severe damage to plasma-facing surfaces of a tokamak structure (Runaway Electrons, or RE). This catastrophic destruction includes melt damage, coolant leaks, loss of vacuum, and if it occurs once in every 1000 shots could prevent fusion machines from reaching commercial viability. Fusion-produced electric power is a carbon-free energy source with a nearly inexhaustible fuel source (deuterium) and with few of the potential hazards of conventional nuclear fission. Unlike many of the present renewable sources (solar and wind) it is available 24/7 on demand and can be sited nearly anywhere. Reliable and economical electric power is crucial to U.S. economic growth and necessary for a high quality of life. It is in the public’s interest for DOE to investigate a scientific solution applicable across the fusion industry. All fusion machines can benefit from an effective and timely resolution to this critical problem. This proposal addresses the development of a vacuum feedthrough and fast-acting, high current switch controlling a magnetic coil which eliminates destructive electron beams from fusion machines. The problem will be addressed by theoretical design, numerical analyses, and hardware construction. The full-scale switch and feedthrough will be installed in a working fusion device for full-scale tests. Future installation of a prototype is planned on a fusion device. In Phase I, design of the switch and feedthrough and tested critical components of the final system occurred. Analytical designs, numerical modeling and critical component hardware fabrication were performed to establish feasibility. Objectives: Update the specification with the lessons learned from the critical components testing; design, fabricate, and test the 350-kA switch and feedthrough inhouse and on a fusion device; and finalize a design for a 350-kA class switch and radiation resistant feedthrough for other fusion pilot plants. Other tokamaks that could use the switch and feedthrough will be identified and discussion will occur with the appropriate technical points of contact to see if any differences to the specifications arise. The fusion industry is growing rapidly focused on high current, high magnetic field machines. These machines are the target market.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

166 SBIR/STTR records share this UEI (1989–2025). Reported award amounts total $65,542,650. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, Department of Agriculture, Environmental Protection Agency, National Science Foundation

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.